Temporary transverse bracing structure with adjustable internal force of h-shaped tower column and its construction method
A construction method and tower column technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of difficulty in demolition work, difficulty in adjusting jacking thrust, and delay in construction period, so as to reduce the workload of high-altitude welding and reduce high-altitude operations Risk, time-reducing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Such as Figure 1 to Figure 5 The temporary cross bracing structure with adjustable internal force of the H-shaped tower column includes cross brace 1 and corbels 3 fixed on the tower columns 2 on both sides respectively. The cross brace 1 is mounted on the corbel 3, and the cross brace 1 includes The abutting end of one side of the tower column 2 abuts and the pushing end at the opposite end of the abutting end, and the movable place between the pushing end and the other side of the tower column 2 is inserted with a copy pad, which is a copy pad in this embodiment A steel plate (not shown in the figure), the pushing end is provided with a pushing part 5, and the pushing part 5 is displaced to the abutting end after receiving the pushing force.
[0035] Preferably, the pushing end has a stepped shaft structure, the shaft head of the stepped shaft structure is mounted on the corbel 3, and the shoulder of the stepped shaft structure constitutes the pushing part 5. The pushi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 