Unlock instant, AI-driven research and patent intelligence for your innovation.

Methods of installing, fixing, dismantling and moving the concrete guardrail formwork of viaducts and bridges

A technology for elevated road bridges and concrete, which is applied in the direction of erecting/assembling bridges, bridges, bridge parts, etc., and can solve problems such as excessive equipment, low efficiency, and reduced inherent quality of the project

Active Publication Date: 2016-03-23
科信宝(山东)技术转移有限公司
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

These tasks require workers to be carried out in a suspended state on high-altitude road sections that are off the ground, which takes up many people, equipment and appliances, and the work is difficult, high-risk, and low-efficiency
2. After the concrete is finalized and the formwork is removed, it is still necessary to remove the wedges and studs and repair the damaged rough surface in the suspended state, which not only adds a lot of trouble, but also affects the unity and integrity of the project and reduces the project the inner quality of

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Methods of installing, fixing, dismantling and moving the concrete guardrail formwork of viaducts and bridges
  • Methods of installing, fixing, dismantling and moving the concrete guardrail formwork of viaducts and bridges
  • Methods of installing, fixing, dismantling and moving the concrete guardrail formwork of viaducts and bridges

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Below in conjunction with accompanying drawing, viaduct bridge concrete guardrail formwork of the present invention is installed, fixed, dismantles, moves method and is described in further detail as follows:

[0027] The method for installing, fixing, dismantling and moving the viaduct concrete guardrail formwork of the present invention is composed of connecting joints 8, an inner formwork 2 and an outer formwork 3 that can be opened and closed horizontally, and a hoisting vehicle 4 equipped with a T-shaped hook 5 composition. The width of the outer formwork 3 is greater than the width of the inner formwork 2 by 10 cm, and the upper part of the outer formwork 3 is welded with a plurality of rigid arc-shaped joint arms 9, and the end of the arm is a joint head 10 matched with the inner formwork 2, and the horizontal line above the lower edge is equidistant. A leading screw hole 13 corresponding to the inner template 2, and a hook groove 17 is provided along the middle ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a device and a method for assembling, fixing, detaching and moving overhead road and bridge concrete guardrail templates and belongs to building engineering. The device comprises an inner template, an outer template, a connecting joint, fixing feet, a supporting pipe, fastening screws, a lifting vehicle and a T-shaped lifting hook, and is characterized in that the connecting joint combines the inner template and the outer template into a whole; the templates are respectively assembled, disassembled and moved by the lifting vehicle at one time; the positions of the templates are fixed by the fixing feet; the supporting pipe and the fastening screws regulate and limit a concrete casting cavity; the templates are stripped under the lever effect of the T-shaped lifting hook. Compared with the prior art, the device and the method have the advantages of simplifying procedures, saving materials, reducing labor intensity and improving working efficiency and engineering quality, and particularly, the suspension operation and construction outside a road and a bridge are not required, and the safety of constructors is facilitated, so that the device and the method have very good popularization and application value.

Description

1. Technical field: [0001] The invention belongs to construction engineering, in particular to a method for installing, fixing, dismantling and moving concrete guardrail templates for viaducts and bridges. 2. Background technology: [0002] High-speed and viaducts account for an increasing proportion of modern land transportation, and cast-in-place concrete guardrails with anti-collision functions on both sides are widely used. In the prior art, there are many unsatisfactory parts in the loading, fixing, dismantling and moving process of cast-in-place concrete guardrail formwork and the equipment used, mainly including: 1. The construction of the concrete guardrail is completed at the main body of the road and bridge deck, and the supporting device After dismantling, the inner and outer templates are installed separately, and unified positioning and fixing are completed. The vertical lifting of the outer formwork is mostly set on the side of the road bridge surface, and the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D19/10E01D101/24
Inventor 张德平张峰董兰田
Owner 科信宝(山东)技术转移有限公司