Coincidence method for outgoing transmission lines in isolated grids with wind power adapted to three-phase tripping
A technology of sending out lines and isolated grids, which is applied in the reclosing field including the isolated grid operation of wind power grids. It can solve the problems of small systems failing to meet the requirements of inspection synchronization, failure of reclosing, frequency and voltage of isolated grids exceeding limits, etc. Allowable closing time and frequency, improve the success rate, and ensure the effect of stable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as image 3 As shown, a method to adapt to the three-phase tripping formation of a wind power outgoing line for isolated grid operation includes the following steps:
[0040] Step 1. When the transmission line of the isolated grid with load including wind power fails, the protection quick-break action three-phase trip, at this time, the output of various generators in the isolated grid remains unchanged, and the load remains unchanged; that is, the conventional power injection power in the isolated grid P 0 , Wind farm injected power P f And load P load No change; the transmission power sent out before the detection of the fault is the surplus power △P 1 , Where △P 1 =P f +P 0 -P load ;
[0041] Step 2. Determine the above surplus power △P 1 Power injected with wind farm P f Size: If the wind farm injected power P f Greater than surplus power△P 1 , The high-frequency cut-off method is adopted for the wind farm to reduce the injected power P of the wind farm f , Reduce t...
Embodiment 2
[0058] Such as figure 1 , figure 2 As shown, the installed capacity of the wind farm on the isolated grid side is 30MW, each wind turbine output is 1.5MW, the generator G1, the generator G2 and the generator G3 are all conventional energy sources, the installed capacity is all 50MW, the initial power angle of the generator is 25°, and the power generation Rotor time constant T j = 6s. After a three-phase fault occurs at point f, the protection action trips, and the surplus power of the isolated grid transmission line including the wind farm at this time is detected △P 1 ;Compare △P 1 Power injected with wind farm P f the size of.
[0059] Surplus power△P 1 Greater than the injected power P of the wind farm f ; Since the initial power is greater than the injected power of the wind farm, you can consider removing all wind power at this time, and reduce the injected power of the wind farm to 0, and determine the surplus power △P at this time 2 ; Based on the equal area rule (Accel...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



