A high-speed rail dispatching method and system accurate to the second using RFID technology
A scheduling method, high-speed rail technology, applied in the fields of automatic systems, railway signals and safety, etc., can solve problems such as inability to make stops, unrealizable, prone to rear-end collision accidents, etc., to achieve fast reading speed, fast and accurate scheduling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] This embodiment provides a high-speed rail scheduling method that uses RFID technology to achieve precision to the second, such as figure 1 and figure 2 shown, including the following steps:
[0058] S1: Set up several RFID cards on the high-speed rail track, wherein each RFID card has a unique code, and there is a corresponding block area between two adjacent RFID cards. A reader / writer capable of data transmission with the RFID card on the high-speed rail track is installed on the high-speed rail train.
[0059] S2: Generate planning schedule:
[0060] Before the high-speed rail train is put into operation, the driver drives the high-speed rail train along the track line at a specified speed. During the driving process, the driving data is obtained every H seconds, and the driving data includes the driving distance S i , travel time t i , travel speed V i and RFID card code R i . The above-mentioned travel data are associated to form a planned schedule, wherei...
Embodiment 2
[0103] This embodiment provides a high-speed rail scheduling method and system accurate to the second using RFID technology, such as Image 6 shown, including:
[0104] RFID cards are set on high-speed rail tracks, each RFID card has a unique code, and there is a blocking area between two adjacent RFID cards.
[0105] The reader is set on the high-speed rail train, and it can perform data transmission with the RFID card on the high-speed rail track.
[0106] Planned timetable generation module: before the high-speed rail train is put into operation, the driver drives the high-speed rail train to run at a prescribed speed along the track line. During the running process, the driving data is obtained every H seconds, and the driving data includes driving Mileage S i , travel time t i , driving speed V i and RFID card code R i . The above-mentioned travel data is associated to form a planned schedule, wherein the travel time t i As a reference time, the mileage S i As a r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com