Gradually-densified node type river control work arrangement method for wandering river channel
A layout method and node technology, applied in river regulation and other directions, can solve problems such as large amount of long river regulation projects, large one-time investment of resources, and inability to adjust the regulation plan, so as to reduce financial pressure, reduce total project investment, and reduce maintenance costs. Easy-to-build effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific preferred embodiments.
[0025] A gradual intensification node-type control and guidance engineering layout method for wandering rivers, including the following steps:
[0026] The first step is to determine the inherent nodes of the river in the wandering channel: to determine the wandering channel based on visual inspection or years (usually more than 3 years, preferably 5-10 years) with an average lateral swing of no more than 0.01 times the width of the riverbed Intrinsic nodes of the channel in . The inherent nodes of the river course can be natural nodes or artificial nodes. Among them, natural nodes include towering mountains or hard rocks or stone alum heads, etc.; artificial nodes include embankments or bridges built artificially. It does not need to be considered if there are no inherent nodes of the river channel.
[0027] The ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap