Dry method installing construction method for offshore large-tonnage prefabricated abutment
A technology of construction method and installation method, which is applied in basic structure engineering, erection/assembly of bridges, bridges, etc., can solve the problems of low installation and operation efficiency of large-scale machinery, and it is difficult to achieve stable installation and construction of prefabricated piers and abutments, so as to meet the construction strength. And the effect of safety and efficiency, high construction efficiency and reasonable design
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The dry installation and construction method of the offshore large-tonnage prefabricated piers are as follows:
[0031] 1. Use large-diameter steel cylinder cofferdams for vibration-sinking construction to form a dry construction environment; figure 1 As shown, a steel cylinder cofferdam 20 with a diameter greater than the maximum diagonal length of the prefabricated pier is used to carry out vibration-sinking construction outside the six steel pipe piles 10 at the installation position of the prefabricated pier, and excavate the inside of the steel cylinder cofferdam. Install the steel support at the bottom of the steel cylinder cofferdam.
[0032] 2. Setting of hanging points for prefabricated piers; figure 2 As shown, the post-casting hole 32 is reserved on the bottom cap 30 of the prefabricated pier abutment, the embedded parts are set, and the back-pressure beam 31 is set on the diameter of the post-casting hole corresponding to the part where the hydraulic suppo...