A technology of anti-lodging and support net, applied in plant support, horticulture, botany equipment and methods, etc., can solve the problems of labor and time-consuming, troublesome management of bananas, no wind protection, etc., to achieve resistance to lodging and breaking, and improve stability The effect of sex and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] 1. The structure of the cement pole: steel and cement, the top is 10 cm, the bottom is 15 cm, and the length is 3.6 meters (the size of the cement pole can be changed due to planting plants or the connection position between the traction line and the cement pole can be set).
[0058] 2. Embedding cement poles; bury cement poles at both ends of a row of bananas, the cement poles stand upright at 90 degrees, and use hard materials to bury and press around the poles, and pull and bury the anti-fall board lines. The distance between the two cement poles varies from place to place.
[0059] 3. Pull the traction line; first, use a 4 mm diameter steel wire as the traction line to connect the two cement rods at both ends to build a bracket, then bind the traction line to the fulcrum cement pole in the middle, and pull each other tightly.
[0060] 4. Binding: use a strap to connect the banana plant with the traction line of the support and tie it firmly. The binding position is...
Embodiment 2
[0064] 1. The structure of the cement pole: steel bars and cement, the top is 10 cm, the bottom is 20 cm, and the length is 4.5 meters (the connection position between the traction line and the cement pole can be set by changing the size of the cement pole due to planting plants).
[0065] 2. Embed cement poles; bury cement poles at both ends of a row of bananas with a length of 80 meters. The cement poles stand upright at 90 degrees, and use hard materials to bury and press around the poles, and pull and bury the anti-fall board line. After burying the cement poles at both ends, set a cement pole every 20 meters in the middle as a fulcrum.
[0066] 3. Pull the traction line; first, pull three traction lines with a diameter of 6 mm at the positions corresponding to the upper, middle and lower parts of the main stem of the plant to connect the two cement rods at both ends to build a bracket, and then separate the three traction lines. Bind to the fulcrum cement pole in the midd...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com