Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of tunnel early-stage support clearance-intrusion processing method

A technology of initial support and treatment method, applied in tunnels, tunnel linings, mining equipment, etc., can solve the problems of long paragraphs, hitting the human body, and safety risks in the arch-changing operation, and achieves the effect of low cost and high work efficiency.

Active Publication Date: 2015-10-21
广东省九域工程技术咨询有限公司
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) Arch replacement: The arch replacement operation generally includes construction steps such as grouting consolidation, manual removal, and replacement of supports. During manual removal operations, the fallen objects may directly hit the human body. Therefore, there is a great safety hazard in the arch replacement operation. risk
Since adjusting the longitudinal slope is to lower the overall elevation of the tunnel, the section affected by this treatment method is too long, which has a great impact on the section that has been under normal construction, and it is time-consuming and laborious to deal with, which is not conducive to the normal construction of the tunnel.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of tunnel early-stage support clearance-intrusion processing method
  • Tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of tunnel early-stage support clearance-intrusion processing method
  • Tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of tunnel early-stage support clearance-intrusion processing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The processing object of the present invention is the section of the tunnel where the invasion and limitation disease has occurred. Generally speaking, the arch of a tunnel is prone to encroachment, but the phenomenon of encroachment on the side wall of the tunnel is relatively rare. The present invention is applicable to the situation that the arch of the tunnel has encroachment.

[0028] like figure 1 , 2 Shown, the present invention a kind of processing method of initial support encroachment of tunnel, specifically comprises the following steps:

[0029] ⑴ Utilize the margin in the design drawing of the inner contour of the tunnel (the cross-sectional area required for superelevation, ventilation and other functional facilities considered in the design) to optimize the design of the inner contour of the tunnel: on the premise that the design elevation of the tunnel remains unchanged , reduce the arch design inner contour line 1 of the tunnel as the optimized arch i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of the tunnel early-stage support clearance-intrusion processing method. The method comprises the following steps of: performing optimized design on a design inner contour line of a tunnel (the design inner contour line of the arch part of the tunnel is lowered to be used as an optimum inner contour line of the arch part on the premise of keeping the tunnel design elevation unchanged; the optimized inner contour line of the arch part is positioned between a tunnel building boundary line and the design inner contour line of the arch part; the side wall circular arc line of the optimized inner contour line of the arch part is in consequent connection with the side wall circular arc line of the design inner contour line of the tunnel; the optimized inner contour line of the tunnel is obtained; and an optimization design drawing is determined); (2) reinforcing a clearance-intrusion section of the tunnel; (3) performing construction according to the optimization design drawing (lining is constructed on the clearance-intrusion section of the tunnel according to the optimized inner contour line; a secondary lining arch part of a non-clearance-intrusion section adjacent to the clearance-intrusion section in the longitudinal direction is in consequent connection transition with the constructed lining arch part of the clearance-intrusion section). The method and the equipment have the advantages that simplicity is realized; implementation is easy; the cost is low; the work efficiency is high; and the normal construction of the tunnel is facilitated.

Description

technical field [0001] The invention relates to a treatment method for initial support invasion of tunnels, and also relates to construction supporting equipment for realizing the treatment method. Background technique [0002] In recent years, with the rapid development of my country's infrastructure construction, tunnels have developed in the direction of large cross-sections and large buried depths. Therefore, the tunnel passes through weak and broken surrounding rock (that is, within a certain range around the tunnel, which has an impact on the stability of the tunnel body) Rock or soil) conditions, complex geological environment and high ground stress are inevitable. However, due to the complexity of the tunnel engineering geological environment, the limited accuracy and detail of geological exploration, and the differences in the construction technology level of construction units, various engineering problems are bound to be encountered during the construction process....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/14E21D11/10
Inventor 王超李国安梁淦波聂玉文温玉辉王强杨宝峰刘祥兴
Owner 广东省九域工程技术咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products