Uninterrupted forwarding soft transition method

A soft transition and ground adjustment technology, applied in the direction of electrical components, circuit devices, etc., can solve problems such as time-consuming, hidden dangers of personal and equipment safety, and difficult construction, so as to save cables and funds, ensure personal and equipment safety, shorten The effect of duration

Inactive Publication Date: 2015-11-04
HEILONGJIANG PATENT TECH DEV
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The present invention provides an uninterrupted forwarding soft Transition method, the concrete technical scheme that solves this problem is as follows:

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach 1

[0012] Specific implementation mode one: The steps of the method of the present embodiment are as follows:

[0013] Step 1. Keep the original conventional RTU forwarding mode of forwarding ground adjustment in a 220KV substation unchanged, and set up a four-wire analog transition communication link between the comprehensive automatic remote control host and the ground adjustment front;

[0014] Step 2. On the main station side of the ground survey, establish a virtual factory station without a specific map library structure. It only receives and interprets the information of the comprehensive automatic remote control host forwarded by the 220KV substation through the transition link. After the comprehensive self-transformation The collection of telecontrol information is sequentially accessed at intervals and increased one by one. In this way, there are two sources of information that are not repeated for this 220KV plant station. One is that the original plant station receive...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an uninterrupted forwarding soft transition method, relates to an electric power system integrated automation reconstruction information transmission method, and solves problems of the requirement of large amount of secondary cables, difficult and time-consuming construction and unsafe hidden trouble on persons and equipment. The method is realized by adopting transition of the secondary cables to a temporary transition link and a virtual plant station. A transition communication link is adopted, and integrated automation information and RTU acquisition information are transmitted to local dispatching simultaneously by additional arrangement of the temporary transition link. After the end of integrated automation reconstruction, the temporary transition link can also be used as metering and other channels. The virtual plant station is adopted, one virtual plant station is established at a local dispatching EMS master station to receive telecontrol information after 220KV integrated automation reconstruction, and information after reconstruction is correlated to the virtual plant station so that information correlation is realized, which has no interference on local dispatching and provincial dispatching. Personal and equipment safety is powerfully guaranteed, the construction period is shortened and large amount of cables and funds are saved.

Description

technical field [0001] The invention relates to a method for transmission of integrated self-correction information of a power system, in particular to a soft transition method for uninterrupted forwarding. [0002] Background technique [0003] At present, in addition to the real-time transmission of the telecontrol information of the 220KV substation to the provincial and local surveys, the information of some important measuring points has to be forwarded by the provincial dispatch to the network dispatch in real time. very strict. Since the 220KV substation constitutes the main network frame of the power grid, the reliability of power supply is very important. It is not allowed to carry out comprehensive self-renovation construction after a long-term power outage. To extend the renovation period, usually more than 3 months. The Provincial Commission has clear document requirements for the transmission of telecontrol information during the comprehensive self-renovation...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J13/00
Inventor 杨太杨松
Owner HEILONGJIANG PATENT TECH DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products