A fast-slow separation interchange system
An overpass, fast and slow technology, applied in the direction of roads, roads, buildings, etc., can solve the problems of parking on the left side of the road, cannot guarantee the green wave belt, and the elevated area occupies a large area, so as to reduce traffic accidents, give full play to functionality and The effect of serviceability and low construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0025] Example 1: The most commonly used tunnel main road or elevated main road implementation; figure 1 , figure 2 , image 3 , Figure 4 ,and Figure 5 As shown, two roads A and B intersected by a cross or X, said road A includes A forward main road 1 and A reverse road 5 near the inner centerline of the road, and A near the outside of A forward main road 1 Auxiliary road 3 and A pedestrian and non-motor vehicle lane 7 on the outside of A auxiliary road 3 and A reverse road 5, said road B includes B forward main road 2 and B reverse road 6 close to the middle line of the road inner side, The B auxiliary road 4 on the outside of the B forward main road 2 and the B pedestrian and non-motor vehicle lane 8 on the outside of the B auxiliary road 4 and the B reverse road 6, the A forward main road 1 is the A main road at the crossing road B. A main road passes through the tunnel or A main road crosses the viaduct 13, and A A main road passes under the tunnel or A main road cr...
example 2
[0029] Example 2: Composite version implementation mode; on road A, only A reverse lane 5 is set to connect to the A center line across the elevated or A center line under the tunnel 14, on the A center line across the elevated or A center line under the tunnel 14, A reverse road 5 on both sides of A and reverse road 6 of B is provided with AB reverse road connecting ramp 12, and at the crossing, the B forward main road 2 outside and B reverse road 6 are set to lead to A The B two-way connected U-turn ramp 10 that crosses the elevated road on the center line or the A center line goes down through the tunnel 14 is integrated with the AB reverse road connected ramp 12. This embodiment is a composite version of the present invention and can be implemented on wider roads. The functions of the two roads in the above-mentioned another embodiment of the present invention are replaced by one road.
example 3
[0030] Example 3: Tram version implementation of the present invention: as Figure 7 As shown, only the high-flow area 17 is set on the high-flow area 17 to cross the road B on the middle line of A or the tunnel 14 under the middle line of A, and only one-way tram facilities 19 are set in the high-flow area 17. In the upper and lower high-flow areas When 17 intersects, trams are set to communicate with slow-turning ramps 20 and tram facilities 19 are set to realize intersecting trams intercommunicating and turning; the development of the original trams has been limited by road conditions, and they have almost withdrawn from the stage. The present invention is creative for development Public rail transit provides the conditions.
[0031] Such as Figure 5 Shown, match # shape one-way network implementation mode; In the area where road A and road B intersect to form any included angle, # shape one-way network 18 is set, and described A auxiliary road 3, B auxiliary road 4, A re...