Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0049] In the first embodiment, the sand piling can adopt the package template method, and the multi-layer accumulation can be realized through tools such as forklift, rammer, water, loose sand, cement, template, iron wire, iron nail, etc. figure 2 As shown, it specifically includes the following steps:
[0050] First, in one embodiment, when the mud content of the loose sand is too low or the sand itself is too large to cause insufficient viscosity, the loose sand and cement are mixed to form a sand-sand mixture, and the sand-silt mixture is mixed by water. Permeable irrigation is carried out to make the sand and sand mixture completely soaked. After a period of time, the sand and sand mixture after permeable irrigation is stacked by a forklift into a base sand pile. The height and position of the base sand are determined by the sculpture work . The mixing ratio of loose sand and cement is 40:1.
[0051] In one embodiment, when the viscosity of the loose sand is relatively high,...
Embodiment approach 2
[0074] The second embodiment, not shown in the figure, the artificial sand pile method, the steps are as follows:
[0075] First, the loose sand is directly piled into a carved sand pile, and then the loose sand is irrigated through water to make the loose sand completely wet. The general height of the carved sand pile is set to be approximately equal to 60cm, which can effectively prevent the upper layer of loose sand from collapsing due to the high height.
[0076] Second, tamping the loose sand, using a shovel to beat or trample the osmotically watered loose sand from bottom to top. At the same time, watering should be done regularly and quantitatively during the tapping or stepping process to avoid too little water and reduce its viscosity At the same time, point-to-point watering is not allowed, so as not to wash down the carving sand pile.
[0077] Sculpture is mainly composed of 1-30 oil painting knives, water spray cans, straws, special glue for sand sculpture, large and sma...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com