A technology of foamed cement and dovetail grooves, applied in building components, building structures, buildings, etc., can solve the problems of complicated welding process equipment, cumbersome secondary anti-corrosion, and low work efficiency, and achieve excellent sound insulation performance and excellent fire prevention The effect of performance, easy installation and operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Such as Figure 1-1 to Figure 1-4 , Figure 2-1 to Figure 2-3 , Figure 3 to Figure 5 As shown, the present invention includes: a foamed cement composite bottom board 1 , a foamed cement composite wallboard 2 , and a foamed cement composite top board 3 . In the foamed cement composite bottom plate 1 or the foamed cement composite wallboard 2 or the foamed cement composite top plate 3, a dovetail groove type steel frame side rib 6 is arranged; the described dovetail groove type steel frame side rib 6 is composed of The upper and lower flanges and the groove 61 are formed; and the embedded component wedge block 7 is provided in the groove 61 of the dovetail groove steel frame side rib 6; and the bolt 74 is provided in the wedge block 7 Cooperating holes 70 and slots 71 in which nuts 73 can be placed.
[0052] The connection between the foamed cement composite base plate 1 and the described foamed cement composite wallboard 2 is to pass through the right-angled connecto...
Embodiment 2
[0068] Such as Figure 1-1 to Figure 1-4 , Figure 6-1 to Figure 6-2 , Figure 7 As shown, the present invention includes: a foamed cement composite bottom plate 1, a foamed cement composite wallboard 2, and a foamed cement composite top plate 3 as described in Example 1. In the foamed cement composite bottom plate 1 or the foamed cement composite wallboard 2 or the foamed cement composite top plate 3, a dovetail groove type steel frame side rib 6 is arranged; the described dovetail groove type steel frame side rib 6 is composed of The upper and lower flanges and the groove 61 are formed; and the embedded part wedge block 7 is provided in the groove 61 of the dovetail groove type steel frame side rib 6; Hole 72.
[0069] The connection between the foamed cement composite bottom plate 1 and the described foamed cement composite wallboard 2 is through the groove 61 of the right-angled connector 8 and the plate dovetail groove steel frame side rib 6 through the bolt 74 The we...
Embodiment 3
[0082] Such as Figure 1-1 to Figure 1-4 , Figure 8-1 to Figure 8-2 , Figure 9 As shown, the differences between the present embodiment 3 and the embodiment 1 are: 1. Another structure of the wedge block 7 is that the wedge block 7 is provided with a bolt 74 that cooperates with a nut 73 . Second: add a rib plate 82 to the right-angled connecting piece 8 to meet the strength of the plate connection by enhancing the strength of the connecting piece. Other features of Embodiment 3 are the same as those of Embodiment 1 above, so details are not repeated here.