Bentonite stone combined wall
A combined wall and bulk stone technology, applied in the direction of walls, building components, buildings, etc., can solve the problems of poor integrity, rising cost, earthquake damage, etc. The effect of safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0051] Such as Figure 1-4 As shown, the embodiment of the present invention provides a puffed stone composite wall. Among the upper and lower sides of each wall panel, one surface is provided with a first tenon 1 whose height extends along the up and down direction, and the other surface is provided with a The depth of the first mortise 2 extending along the up and down direction, during the installation process, the first tenon 1 is inserted into the first mortise 2; in the left and right ends of the front side or rear side of each wallboard, one end is set There is a second mortise 3 whose height extends along the front-to-back direction, and the other end is provided with a second mortise 4 whose depth extends along the front-to-back direction. During the installation process, two second mortises 3 are inserted side by side into one second mortise 4 .
[0052] Therefore, in the actual installation process, in the height direction of the combined wall, insert the mortise o...
specific Embodiment 2
[0071] Such as Figure 5-8 As shown, in the puffed stone composite wall provided by the embodiment of the present invention, among the upper and lower sides of each wallboard, one surface is provided with a third mortise 6 whose height extends along the up and down direction, and the other surface is provided with a third mortise 6 with a depth extending along the up and down direction. The third mortise 7 extending in the direction, the third mortise 6 can be inserted into the third mortise 7; the front side or rear side of each wall panel is provided with a fourth mortise 8 and a fifth mortise extending along the front and rear direction 9. The fourth tenon 8 is set at the left edge, the fifth tenon 9 is set near the right edge, and the fourth tenon 8 can be inserted into the space between the fifth tenon 9 and the right edge; or, the fourth tenon 8 is arranged near the left edge, the fifth tenon 9 is arranged at the right edge, and the fifth tenon 9 can be inserted into the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 