A fast calculation model establishment method for horizontal well transient pressure to improve near-wellbore pressure drop
A technology of model building and fast calculation, which is applied in wellbore/well components, earthwork drilling, design optimization/simulation, etc., can solve the problems of high time-consuming history matching, distortion, and low ratio of vertical and horizontal permeability, etc. Achieve the effect of simplification of calculation and increase of calculation speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.
[0063] like figure 1 As shown, a method for establishing a fast calculation model of transient pressure in horizontal wells to improve near-well pressure drop includes the following steps:
[0064] S1. Consider horizontal wells in anisotropic reservoirs, where the x and y directions are infinite, where k x 、k y and k z are the directional permeability of the formation, respectively. Assuming single-phase fluid seepage in the reservoir, the fluid is slightly compressible, and the length of the horizontal well is 2L h , the thickness of the reservoir is h, the upper and lower sides of the reservoir are closed boundaries (z=0 and z=h), the horizontal well is parallel to the upper and lower boundaries, ignoring the effect of gravity, the in...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


