Cut off the remaining precast concrete pipe pile regenerative connection method
A technology of prefabricated concrete and recycled connections, which can be used in sheet pile walls, buildings, infrastructure engineering, etc., and can solve problems such as waste of materials and environmental pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] see Figure 1 to Figure 6 , the present invention truncates remaining prefabricated concrete pipe pile regenerative connection method, comprises the steps:
[0024] 1) Take a section of cut-off remaining concrete pipe pile - the first pile section 1 is placed flat on the processing site, the pile section 1 has a length of 6.2m, an outer diameter of 600mm, an inner diameter of 380mm, and a thickness of 110mm;
[0025] 2) Take a connecting steel coil 2 of a straight seam steel pipe that has not yet been welded and put it on the outside of the truncated end face of the first pile section 1. The longitudinal length of the connecting steel coil 2 is 700 mm, and it is set on the outside of the first pile section 1. The longitudinal length is 330mm, its unclosed circumferential length is 2000mm, and its thickness is 10mm;
[0026] 3) On the truncated end face of the first pile segment 1 to be connected, a filler 3 (fine stone concrete) that is initially plastic and can be har...
Embodiment 2
[0031] see Figure 1 to Figure 5 , Figure 7 , the present invention truncates remaining prefabricated concrete pipe pile regenerative connection method, comprises the steps:
[0032] 1) Take a section of cut-off remaining concrete pipe pile - the first pile section 1 is placed flat on the processing site, the pile section 1 has a length of 6.2m, an outer diameter of 600mm, an inner diameter of 380mm, and a thickness of 110mm;
[0033] 2) Take a connecting steel coil 2 of a straight seam steel pipe that has not yet been welded and put it on the outside of the truncated end face of the first pile section 1. is 330mm, its unclosed circumferential length is 1884mm, and its thickness is 8mm;
[0034] 3) On the truncated end face of the first pile segment 1 to be connected, an annular filler 3 (sulfur cement) which is initially plastic and can be hardened in the later stage is provided. The longitudinal length of the filler 3 is 40 mm, and its annular outer diameter is 580 mm, and...