Quickly adjustable support for a cover beam and its construction method
A technology for adjusting brackets and construction methods, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of long process duration and high cost, and achieve convenient unloading, ensure physical quality, and speed. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Such as Figure 1 to Figure 2 Shown, a kind of cover beam of the present invention can quickly adjust the construction method of support, and this construction method is carried out according to the following steps successively:
[0028] (1) Hoop installation: The hoop installation is to calculate the hoop installation elevation on the circular pier 6 according to the height of the cover beam, and install the hoop 5 designed by force calculation on the specified elevation after measuring with the level instrument. A white geotextile is installed between the hoop 5 and the pier column 6 to enhance the friction between the hoop 5 and the pier column 6 and to protect the appearance of the pier column. The hoop connection bolts are high-strength bolts, and the torque wrench is used to verify the tightening of the bolts. After the bolts have been used for a period of time, check the condition of the bolt wires in time, and replace the bolts in time if they are found to be de...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com