Tunnel engineering multi-steel-arch connecting device
A technology for connecting devices and tunnel engineering, applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of slow positioning speed, increased tunnel risk, long working time, etc., to save positioning, increase overall stability, and improve efficiency. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Such as Figure 1-3 The shown multi-prong connection device for a tunnel engineering steel arch includes a connection brace 1 and a chute 2 located on the steel arch 4, one end of the connection brace 1 is fixedly connected to the steel arch 4, and the other end of the connection brace 1 One end is connected with the chute 2, and the connecting end can slide up and down in the chute 2; the connecting brace 1 includes two cross-connected connecting pieces 3, and the two connecting pieces 3 can move relative to each other at the connection point as an axis. The arch frame has 4 arcs corresponding to the arc.
Embodiment 2
[0021] The use process of the tunnel engineering steel arch multi-joint connection device of the present invention is as follows:
[0022] ①. Carry out the processing and manufacturing of the steel arch 4 in the processing area to ensure the accuracy of the steel arch 4;
[0023] ②. Select the connecting device according to the design requirements, and ensure that the arc of the connecting piece 3 is compatible with the arc of the steel arch 4, so as to ensure the smooth opening of the device;
[0024] ③. Determine the number of steel arch frames that need to be connected according to the actual footage, such as image 3 Said, in the present embodiment adopts three joints. Select a suitable connecting device according to the spacing of the steel arch 4, and fix the lower hole of the connecting piece 3 of the connecting device on the steel arch 4 by punching holes on the steel arch 4 and connecting with bolts. The chute 2 on the frame 4 is connected to ensure that it moves up...
Embodiment 3
[0030] The structure and connection relationship of each part of a tunnel engineering steel arch frame multiple connection device described in this embodiment are the same as those in Embodiment 1, and the different technical parameters are:
[0031] 1) The chute 2 is arranged on the backing plate 5;
[0032] 2) The four ends of the connecting piece 3 are connected with the backing plate 5 through bolts;
[0033] 3) The backing plate 5 and the steel arch 4 are connected by bolts;
[0034] 4) Use two blocks and one joint during construction.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com