Rapid Metal Anchor Wall Construction Method for Controlling Air Leakage in General Return Airway of Mine in Karst Area
A technology for air leakage and construction method of return airway, applied in mining equipment, earthwork drilling, installation of bolts, etc., can solve the problems of reducing the effective air volume rate of the mine, difficulty, and increasing the cost of mine ventilation and electricity consumption, so as to improve the safety of the mine. Production level, equipment and material requirements are not high, good effect and economic effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In order to further understand the content, features, and effects of the present invention, the following embodiments are exemplified, and are described in detail below with accompanying drawings.
[0022] Weixin Coal, Furong Company of Sichuan Coal Group, is located in Linbao Village, Zhendong Township, Xuyong County, Guxu Coal Field, a national high-quality anthracite coal base. It is a provincial-level state-owned key coal mine. The mining area is 2km away from the 321 National Highway and 4km from the entrance of the Naqian Expressway. The Zhendong Railway Station (under construction) of the Syrian-Dalian Railway passes through the boundary of the mining area. The transportation is very convenient. The total reserves of the mine are 33.07 million tons, and the area of 3.57 square kilometers has been delimited. At present, the delineated raw coal reserves above +850m level are 9.8 million tons, and the mineable coal seams are C19, C20, and C24. Among them, C19 and C20...