Die for constructing urban mass transit turnout point switch foundation pit and construction method
A technology for urban rail transit and switch machines, applied in infrastructure engineering, excavation, construction, etc., can solve problems such as specification deviation and low efficiency, and achieve the effects of improving accuracy, improving construction efficiency, and reducing labor costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Below in conjunction with accompanying drawing, the mold and the construction method of urban rail transit turnout switch machine foundation pit construction of the present invention are described in detail:
[0022] The mold design idea of the urban rail transit turnout switch machine foundation pit construction of the present invention is to pre-design and make several foundation pit molds and sub-divisions in combination with the actual foundation pit size marked in the reserved drawings of the existing urban rail transit switch machine foundation pits. When the construction of the foundation pit is not reserved, the mold blocks are placed in place one by one according to the assembly sequence at the corresponding mileage position of the line, assembled and fixed. and other external action equipment placement requirements. After the molds are placed in place, the construction and ground hardening work will be carried out on the foundation pit of the whole line of s...