Combined type sports instrument
A sports equipment and combined technology, applied in the direction of sports accessories, etc., can solve the problems of large floor area, high construction cost of rock climbing equipment, and inability to popularize, so as to facilitate disassembly, maintenance and replacement, expand the scope of use and utilization rate, and quickly assemble convenient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] like figure 1 As shown, the 5 mounting holes are screw holes provided at the four corners and the central part of the rock climbing board 2. The center of the mounting holes at the four corners of the rock climbing board 2 is 5 cm apart from the side of the rock climbing board 2 . The size of the rock climbing board 2 designed in this way and the position of the installation hole can make the vertical distance between the installation hole at the center and the upper and lower installation holes just be the span between the two ribs 11 of the standard rib frame 1, so that the fixing kit 22 Fix with rib 11. A plurality of rock climbing boards 2 can also be fixed on the rib frame 1 according to the well-arranged rock road with gaps, although the rock climbing wall formed is discontinuous, it does not affect rock climbing training, and, on the back side of the rock climbing wall, rock climbing The spare wooden rod body in the gap of the wall can be used for the training ...
Embodiment 2
[0038] like figure 2 As shown, the positions of the 5 mounting holes of the rock climbing board 2 can be opened randomly according to the attachment points, but the 5 mounting holes are distributed in at least two rows to facilitate the formation of triangular fixing points. A plurality of rock climbing boards 2 can be sequentially connected in parallel to form a whole rock climbing wall without gaps, and each rock climbing board 2 is numbered. When needing to use the rib frame 1, only need to pull down a plurality of rock climbing boards 2 and get final product. When assembling, only assemble according to the number, saving time and effort.
[0039] Of course, the size of the rib frame 1 and the size of the rock climbing board 2 and the installation hole can be matched with other sizes, and it is not limited thereto.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com