Resource recycling method of construction waste and remediation agent for heavy metal polluted soil

A soil remediation agent and a technology for polluted soil, applied in the field of metal-contaminated soil remediation agents, can solve problems such as high cost and complicated operation, and achieve the effect of reducing environmental pollution and waste disposal costs

Active Publication Date: 2020-04-07
甘肃天农一禾农业有限公司
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although this method can obtain a repairing agent with excellent repairing ability, high-temperature calcination is required to prepare modified medical stone, and the cost is relatively high and the operation is complicated.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource recycling method of construction waste and remediation agent for heavy metal polluted soil
  • Resource recycling method of construction waste and remediation agent for heavy metal polluted soil

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Treatment of construction waste: crush 100kg of construction waste (more than 50% is concrete) into powder, pass all these powders through a 1200-mesh molecular sieve, add 200kg of 5% citric acid aqueous solution at room temperature and stir for 1 hour, then add 20kg of polysulfide Calcium was stirred, stirred at room temperature for 4 hours, the mixed solution passed through a 1200-mesh molecular sieve, and the mixed solution passed through the 1200-mesh molecular sieve was allowed to stand for 12 hours, then the water above was pumped out, and the sediment was dried and ground into a building Garbage disposal.

Embodiment 2

[0030] Treatment of construction waste: crush 100kg of construction waste (more than 50% of which are stones) into powder, pass the powder through a 1200-mesh molecular sieve, add 150kg of 8% citric acid aqueous solution at room temperature and stir for 1.5 hours, then add 15kg of citric acid Calcium sulfide was stirred, stirred at room temperature for 5 hours, the mixed solution passed through a 1200-mesh molecular sieve, and the mixed solution passed through the 1200-mesh molecular sieve was allowed to stand for 12 hours, then the water above was pumped out, and the sediment was dried and ground into Construction waste disposal.

Embodiment 3

[0032] A soil remediation agent, which is formed by mixing 50% of construction waste disposal, 15% of silica sol, 7% of humic acid and 28% of metallothionein, wherein the construction waste disposal is prepared according to the method in Example 1. The appearance of the soil remediation agent is gray-black solid powder, and the pH is 7.56 when the solid-liquid ratio (weight ratio to water) is 1:2.5.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a repairing agent for heavy-metal-polluted soil and a resource recycling method of construction waste. The soil repairing agent comprises 40-60% of a construction waste treatment material, 10-20% of silica sol, 5-10% of humic acid and 10-45% of metallothionein; the construction waste treatment material is prepared through the following steps that the construction waste is broken into powder and then screened by a 1200-mesh molecular screen, a citric acid water solution is added and then stirring is conducted for one hour or more, then calcium polysulfide is added and then stirring is conducted for four hours or more, after a mixed solution is screened by the 1200-mesh molecular screen, still standing is conducted to subside, water is pumped out, sediments are dried, and after grinding, the construction waste treatment material is prepared. According to the repairing agent of the heavy-metal-polluted soil and the resource recycling method of the construction waste, resource recycling of the construction waste is achieved for the first time, and on the one hand, environment pollution can be effectively reduced, and waste treatment cost can be effectively lowered; and on the other hand, preparing cost of the prepared construction waste treatment material is remarkably lowered, the repairing property cannot be lowered, or the repairing time cannot be prolonged.

Description

technical field [0001] The invention relates to the field of construction waste treatment and soil remediation, in particular to a method for preparing a heavy metal-contaminated soil remediation agent using construction waste and the prepared metal-contaminated soil remediation agent. Background technique [0002] Soil pollution has become a worldwide problem, and heavy metal pollution has become the "invisible killer" of my country's agricultural products. With the advancement of urbanization in China, chemical pollution has become a major source of pollution. Benzene, phenol, phosphorus organic matter and heavy metals such as cadmium, lead, mercury, and arsenic are heavily polluted. Excessive use of chemical fertilizers will cause soil acidification, which in turn will induce an increase in the activity of heavy metal ions in the soil. Every time the soil pH value drops by one unit, the activity of heavy metal cadmium will increase by 100 times, which will increase the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): B09C1/00B09B3/00C09K17/40
CPCB09B3/00B09C1/00B09C2101/00C09K17/40Y02W30/58
Inventor 许海高素萍谢爱军杨乐常立尤国标
Owner 甘肃天农一禾农业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products