Construction method for full cross-section traversing of glass fiber-reinforced polymer underground diaphragm wall through shield
A technology of glass fiber reinforcement and underground diaphragm wall, which is applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problem of shield tunnel being unable to pass through underground obstacles in full section, and achieve the effect of convenient construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the teachings of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
[0031] The present invention is used in the construction of the shield tunneling project between Xiawafang Station and Zhigu Station in the 16th contract section of the civil engineering construction of Metro Line 5 in a certain city. This section starts from Xiawafang Station and advances to Zhigu Station. The right line is full 1113.956m, the total length of the left line is 1115.492m, using two Ф6450mm compound earth pressur...