Steel bar installation rack and installation method for multi-rib three-directional prestress type prefabricated groove body
A technology of three-way prestressing and installation method, which is applied in the direction of manufacturing tools, hydroelectric power generation, ceramic molding machines, etc., can solve the problems of complex multi-rib structure formwork, influence of tank body construction progress, construction interference, etc., and reach the spreader and site The effect of low requirements, shortened construction time, and convenient construction and operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as Figure 1~5 Among them, a multi-ribbed three-way prestressed prefabricated channel body reinforcement installation platform, the main beam channel body 1 is located on both sides, and a plurality of secondary beam platforms perpendicular to the main beam channel body 1 are arranged between the main beam channel body 1 Frame holes 6, the frame 2 of the secondary beam installation area is formed between the secondary beam frame holes 6;
[0038] The depth of the two ends of the main beam tank body 1 is greater than the depth in the middle, and there are end reinforcement grooves 9 near the two ends of the main beam groove body 1. The end reinforcement grooves 9 are parallel to the secondary beam stand holes 6, and the end reinforcement grooves 9 The depth is greater than the depth of the secondary beam stand hole 6 . In a preferred solution, the main girder trough body 1 , the secondary girder frame hole 6 and the end reinforcing bar trough 9 are all located belo...
Embodiment 2
[0047] On the basis of Example 1, such as Figure 1~6Among them, an installation method using the above-mentioned multi-rib three-way prestressed prefabricated tank body steel bar installation platform includes the following steps:
[0048] 1. According to the structural size of the long-span multi-rib prefabricated tank body, design the detailed dimensions of the special platform for the multi-rib steel bar installation of the large-span tank body, and excavate the main beam tank body 1, the secondary beam platform hole 6 and the end according to the design requirements. Reinforcing groove 9 at the top; Precise setting out with a measuring instrument before excavation;
[0049] Preferably, the main beam tank body 1 is excavated mechanically, and the bench 2 in the secondary beam installation area is excavated manually.
[0050] 2. The base layer of the steel bar installation platform is hardened and leveled, the horizontal surface is made of concrete, the facade is made of b...