Overhead transmission conductor capacity characteristic monitoring system, testing method and device
A technology for overhead transmission wires and monitoring systems, which is applied in the direction of measuring devices, measuring electrical variables, and measuring electricity, and can solve problems such as inability to apply transmission lines
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] In order to solve the problem that the testing technology of traditional new conductors cannot be applied to transmission lines in actual operation, the present invention provides an embodiment 1 of a monitoring system for capacity characteristics of overhead transmission conductors; figure 1 It is a structural schematic diagram of Embodiment 1 of the monitoring system for the capacity characteristics of overhead power transmission conductors of the present invention; figure 1 As shown, it can include a micrometeorological test device 110 and a system master station 120; it also includes several groups of test loops erected between the transmission line poles and towers and connected to a large current generator; the test loop includes two test loops connected to a large current generator Wires 1 and 2, a data acquisition device 130 respectively arranged on each wire to be tested, and a current testing device 140 arranged on any wire to be tested;
[0032] The micro-met...
Embodiment 1
[0063] Based on the technical solutions of the above embodiments of the monitoring system for the capacity characteristics of overhead transmission conductors, and at the same time in order to solve the problem that the traditional new conductor testing technology cannot be applied to transmission lines in actual operation, the present invention also provides a test for the capacity characteristics of overhead transmission conductors Method embodiment 1; Figure 4 It is a schematic flow chart of Embodiment 1 of the method for testing the capacity characteristics of overhead transmission conductors of the present invention; Figure 4 As shown, the following steps may be included:
[0064] Step S410: the micro-meteorological testing device obtains the environmental parameters of the actual operation of the transmission line, and the system master station obtains the reference value of the carrying capacity according to the environmental parameters;
[0065] Step S420: The main ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


