Power load management method and device
A technology of power load and management method, which is applied in the field of electric power, can solve problems such as poor measure strength and rationality, poor effect, and unguaranteed reliability of regional power supply, so as to achieve the effect of improving effect, better distribution and utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see figure 1 The flow chart of the first electric load management method shown, the method includes the following steps:
[0028] Step S102, acquiring electricity consumption data in the current area; wherein, the electricity consumption data includes power users, power consumption properties of power users, power consumption time periods, and power consumption corresponding to power users and power consumption time periods;
[0029]In actual implementation, the power consumption nature of the power user can be obtained through the power consumption application submitted by the power user; through the smart meter of the power user, the power consumption time period of the power user, and the relationship between the power user and the power consumption time can be obtained. The power consumption corresponding to the segment. The smart meter can regularly send the power consumption of the corresponding power users. The shorter the transmission cycle, the more accurately...
Embodiment 2
[0040] see figure 2 The flow chart of the second power load management method is shown. This method is implemented on the basis of the power load management method provided in the first embodiment above. The method includes the following steps:
[0041] Step S202, acquiring electricity consumption data in the current area; wherein, the electricity consumption data includes power users, power consumption properties of power users, power consumption time periods, and power consumption corresponding to power users and power consumption time periods;
[0042] Step S204, dividing the above power consumption time period into a plurality of sub-time periods;
[0043] Step S206, comparing the relationship between the power consumption corresponding to each sub-time period and the preset power consumption range; if the power consumption is within the power consumption range, perform step S208; if the power consumption is higher than the power consumption The maximum value in the rang...
Embodiment 3
[0056] see image 3 The flow chart of the third power load management method is shown. This method is implemented on the basis of the power load management method provided in the first embodiment above. The method includes the following steps:
[0057] Step S302, acquiring electricity consumption data in the current area; wherein, the electricity consumption data includes power users, power consumption properties of power users, power consumption time periods, and power consumption corresponding to power users and power consumption time periods;
[0058] Step S304, according to the power consumption time period and the power consumption corresponding to the power consumption time period, determine the low power consumption time period and the power consumption peak time period of the current area;
[0059] Step S306, according to the power consumption nature of the power user, determine the power load adjustment object;
[0060] Step S308, obtain the low power consumption tim...