Soil pile contact surface friction control type precast concrete pile and pile driving method
A precast concrete, contact surface technology, applied in sheet pile wall, construction, infrastructure engineering, etc., can solve problems such as cost increase, and achieve the effect of low implementation cost, overcoming insufficient lateral friction, and easy implementation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] like Figure 1 to Figure 3 As shown, a soil pile contact surface friction control type prefabricated concrete pile includes a pile body 1, the pile body is a hollow circular tube structure, and the hollow passes through the axis line of the pile body 1.
[0028] The peripheral surface of the pile body 1 is evenly arranged with an array composed of a plurality of wedge-shaped block groups.
[0029] Described wedge block group comprises first wedge block 2 and second wedge block 3, and two wedge blocks are all arranged along the axial direction of pile body 1, as figure 2 As shown, the bottom surface of the first wedge-shaped block 2 is provided with four nail holes 5, and the bottom surface of the second wedge-shaped block 3 is provided with a nail hole. Towards the outside of the pile body 1, and the big ends of the two wedges are opposed together, wherein the first wedge 2 is arranged above the second wedge 3, that is, when piling, the big ends of the first wedge 2 f...
Embodiment 2
[0036] like figure 1 As shown, a soil pile contact surface friction control type prefabricated concrete pile includes a pile body 1, the pile body 1 is a hollow circular tube structure, and the hollow passes through the axis line of the pile body 1.
[0037] The peripheral surface of the pile body 1 is evenly arranged with an array of a plurality of wedge-shaped block groups, and the wedge-shaped block groups include a first wedge-shaped block 2 and a second wedge-shaped block 3, and both wedge-shaped blocks are arranged along the axis of the pile body 1. The two wedge-shaped blocks are respectively attached to the pile body 1 through connectors, the slopes are all facing the outside of the pile body 1, and the big ends of the two wedge-shaped blocks are opposed to each other, as in figure 2 As shown, wherein, the first wedge block 2 is arranged above the second wedge block 3, that is, when piling, the big end of the first wedge block 2 faces downward.
[0038] The first wed...