Multi-tenant based resource scheduling system
A resource scheduling and multi-tenant technology, applied in the field of cloud computing, can solve the problems of waste of resources, high hardware cost, and idle resources cannot be reserved for other purposes, and achieve the effect of saving resources and reducing hardware costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0029] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
[0030] See figure 1 Shown here is a schematic structural diagram of a multi-tenant-based resource scheduling system provided by an embodiment of the present invention. The system includes a resource scheduling device 110, a hyper-converged virtualization cluster 120, and multiple virtual firewall containers. The hyper-converged virtualization cluster 120 contains multiple hosts. Each host runs one or more ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap