Pulling construction method of outer scaffold and wall body internal connecting part
A technology of internal connectors and external scaffolding, which is applied to the accessories of scaffolding, scaffolding supported by house structures, and structural supports of houses to achieve the effects of easy disassembly and assembly, significant efficiency enhancement, and obvious advantages
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Such as figure 1 and figure 2 Shown, the tie construction method of external scaffolding of the present invention and connector in the wall, comprises the following steps:
[0030] (1) Process and manufacture the connecting parts inside the wall;
[0031] (2) Drill installation holes at selected positions on the inner aluminum formwork 1 and outer aluminum formwork 2 arranged in parallel, and install and fix the connectors in the wall in the corresponding installation holes between the inner aluminum formwork 1 and the outer aluminum formwork 2 reliable;
[0032] (3) Concrete mortar is poured between the inner aluminum formwork 1 and the outer aluminum formwork 2;
[0033] (4), after the concrete mortar is solidified to form the wall 13, remove the reusable components of the connectors in the wall, and then remove the inner aluminum formwork 1 and the outer aluminum formwork 2;
[0034] (5) Use the connecting bolt 14 to extend into and thread into the connector ins...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

