Device for fast mounting subway tunnel electromechanical equipment and pipelines
A technology for electromechanical equipment and tunnel segments, which is applied in tunnels, tunnel linings, and bolt installations. Simple effect of pre-embedded construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The content of the present invention will be further described below in conjunction with the accompanying drawings.
[0018] Such as figure 1 , figure 2 and image 3 As shown, the device for rapid installation of subway tunnel electromechanical equipment and pipelines according to the present invention is characterized in that it includes tunnel segments 1, embedded anchor bolts 2, multiple external anti-seismic chutes 3 and mounting brackets 4, The embedded anchor bolt 2 includes a segment positioning device 21 and an anchor bolt 22. An anchor bolt 22 is vertically fixed at both ends of the segment positioning device 21, and the segment positioning device 21 is pre-embedded on the inner side wall of the tunnel segment 1. Among them, a plurality of external anti-seismic chute 3 is arranged along the axial direction of the tunnel segment 1, and each external anti-seismic chute 3 includes a C-shaped toothed chute 31 and at least two mounting bases 32, at least two moun...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com