A method for determining the tidal water level in the design of a long channel alternated with shoals and troughs
A determination method and technology of long waterway, applied in the direction of design optimization/simulation, geometric CAD, special data processing application, etc., can solve the problem of not making full use of high tide level resources, etc., to achieve maintenance dredging engineering volume, excellent calculation accuracy, and reduce engineering effect of investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described below in conjunction with the embodiments and the accompanying drawings.
[0022] The present invention combines the actual navigation mode of the ship, and the implementation scheme is divided into two cases: the ship enters the port by the tide, and the ship leaves the port by the tide. The technical methods of each case are as follows:
[0023] Situation 1: The case of a ship entering the port on tide
[0024] Such as figure 2 As shown, the ship passes the AF channel section along the high tide direction, and the long-term tide station along the channel is A, B, and C. First of all, according to the amount of dredging works for different shallow sections of infrastructure and the difficulty of channel maintenance in the later period, etc., the CD section is determined to be the key dredging section, the AB and EF sections are non-key dredging sections, and the BC and DE sections are the deep ones with relatively good ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


