A pouring pipe fitting for pouring concrete slurry into pile holes

A technology for concrete slurry and concrete piles, applied in construction, infrastructure engineering and other directions, can solve the problems of slow construction progress, difficult control of pile top elevation, and impact on surrounding environment, etc., to achieve the effect of prolonging service life and providing grouting effect.

Active Publication Date: 2019-11-05
CHINA MCC5 GROUP CORP
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the construction methods of prefabricated concrete piles basically adopt the hammering method and the static pressure method. The main defects of these two methods of pile driving are: to produce a soil squeezing effect, which will affect the engineering pile and the surrounding original facilities; It is difficult to control, and the integrity of the pile body cannot be guaranteed; the vibration and noise generated by the hammering method will affect the surrounding environment. Therefore, there are many disadvantages in the pile sinking construction using the hammering method or the static pressure method
However, this method needs to pour cement slurry into the mud hole to form a mixed slurry before sinking the pile. The discharge volume of the mixed slurry is the actual volume of the prefabricated concrete pile or concrete pipe pile, and the discharged mixed slurry contains cement slurry, resulting in waste, while affecting the environment, and the overall construction progress is slow

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A pouring pipe fitting for pouring concrete slurry into pile holes
  • A pouring pipe fitting for pouring concrete slurry into pile holes
  • A pouring pipe fitting for pouring concrete slurry into pile holes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] Such as Figure 1~3 As shown, this embodiment includes an annular grouting head 4 whose inner diameter matches the outer diameter of the concrete pile 1, and an annular buffer chamber 5 is arranged inside it along the circumferential direction of the grouting head 4. In the grouting There are two grouting holes 3 communicated with the buffer cavity 5 on the upper surface of the head 4, the grouting holes 3 are connected to the grouting pipe 2, and a plurality of grooves 9 are opened on the lower surface of the grouting head 4, and each The groove bottom of the groove 9 is provided with a through hole communicating with the buffer chamber 5, a splint 7 is fixed on the groove wall of the groove 9, a universal ball head 10 is arranged on the splint 7, and the upper end of the spray pipe 8 runs through The middle part of the universal ball head 10 is centered with the through hole, and the lower end of the injection pipe 8 extends downward along the axis of the through hole...

Embodiment 2

[0027] Such as Figure 1~3 As shown, in this embodiment, the longitudinal section of the buffer cavity 5 is circular. The longitudinal section of the buffer cavity 5 is circular, so that the cement slurry entering from the two grouting holes 3 can quickly fill the entire buffer cavity 5, so as to quickly realize multiple splits on the bottom surface of the grouting head 4, and in the After the grouting is completed, the grouting pipe 2 and the grouting head 4 need to be cleaned, and the circular inner wall of the buffer chamber 5 is not easy to attach residual grout, so as to facilitate the smooth passage of the grout in the next pile hole grouting .

[0028] As preferably, since the pile hole and the concrete pile 1 are all cylindrical, that is, when the grouting process is carried out to the annular space between the pile hole and the concrete pile 1, a plurality of grooves 9 are located at the circumference of the lower end surface of the grouting head 4, etc. On the divi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pouring pipe used for injecting of pile hole concrete grout. The pouring pipe comprises an annular grouting head, and a buffer cavity is formed in the annular grouting head in the circumferential direction of the grouting head; two grouting holes are formed in the upper surface of the grouting head; the grouting holes are connected with grouting pipes; and a plurality of grooves are formed in the lower surface of each grouting hole. A through hole communicating with the buffer cavity is formed in the groove bottom of each groove; clamping plates are fixed to the groove walls of the grooves, and universal ball heads are arranged on the clamping plates; the upper ends of spraying pipes penetrate through the middles of the universal ball heads and are aligned with the through holes, and the lower ends of the spraying pipes extend downwards along the axes of the through holes to the lower end faces partially protruding out of the grooves; and the two ends of hoses are connected with the bottom of the buffer cavity and the upper ends of the spraying pipes correspondingly, and the axial length of each hose is larger than that of the axis of each through hole. After a concrete pile is sunk, the cement grout is injected into the pile holes, thus the situation that the concrete pile squeezes the excess cement grout out of the pile holes, and thus the cement grout is excessively wasted is avoided, and meanwhile the situation that the overflowed cement grout pollutes the environment or delays the construction period is prevented.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a pouring pipe fitting for pouring concrete slurry into pile holes. Background technique [0002] At present, the construction methods of prefabricated concrete piles basically adopt the hammering method and the static pressure method. The main defects of these two methods of pile driving are: to produce a soil squeezing effect, which will affect the engineering pile and the surrounding original facilities; It is difficult to control, and the integrity of the pile body cannot be guaranteed; the vibration and noise generated by the hammering method will affect the surrounding environment. Therefore, there are many disadvantages in the pile sinking construction using the hammering method or the static pressure method. The rooted pile is drilled with a drilling rig, the soil in the hole is stirred into mud, and the cement slurry is injected into the mud hole to make a mud hole l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D15/04
CPCE02D15/04E02D2250/0023