A pouring pipe fitting for pouring concrete slurry into pile holes
A technology for concrete slurry and concrete piles, applied in construction, infrastructure engineering and other directions, can solve the problems of slow construction progress, difficult control of pile top elevation, and impact on surrounding environment, etc., to achieve the effect of prolonging service life and providing grouting effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as Figure 1~3 As shown, this embodiment includes an annular grouting head 4 whose inner diameter matches the outer diameter of the concrete pile 1, and an annular buffer chamber 5 is arranged inside it along the circumferential direction of the grouting head 4. In the grouting There are two grouting holes 3 communicated with the buffer cavity 5 on the upper surface of the head 4, the grouting holes 3 are connected to the grouting pipe 2, and a plurality of grooves 9 are opened on the lower surface of the grouting head 4, and each The groove bottom of the groove 9 is provided with a through hole communicating with the buffer chamber 5, a splint 7 is fixed on the groove wall of the groove 9, a universal ball head 10 is arranged on the splint 7, and the upper end of the spray pipe 8 runs through The middle part of the universal ball head 10 is centered with the through hole, and the lower end of the injection pipe 8 extends downward along the axis of the through hole...
Embodiment 2
[0027] Such as Figure 1~3 As shown, in this embodiment, the longitudinal section of the buffer cavity 5 is circular. The longitudinal section of the buffer cavity 5 is circular, so that the cement slurry entering from the two grouting holes 3 can quickly fill the entire buffer cavity 5, so as to quickly realize multiple splits on the bottom surface of the grouting head 4, and in the After the grouting is completed, the grouting pipe 2 and the grouting head 4 need to be cleaned, and the circular inner wall of the buffer chamber 5 is not easy to attach residual grout, so as to facilitate the smooth passage of the grout in the next pile hole grouting .
[0028] As preferably, since the pile hole and the concrete pile 1 are all cylindrical, that is, when the grouting process is carried out to the annular space between the pile hole and the concrete pile 1, a plurality of grooves 9 are located at the circumference of the lower end surface of the grouting head 4, etc. On the divi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


