Backfilling Method for Inverted Arch of Tunnel in Cold Region
A cold area tunnel and height technology, which is applied to the field of backfilling of invert arches in cold area tunnels, can solve problems such as reducing hydration heat, and achieve the effects of short construction period, convenient construction, and good thermal insulation performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as Figure 1~2 As shown, the method for inverting backfilling of tunnels in cold regions provided by the present invention includes:
[0024] ① Obtain the invert curvature, height and invert backfill transverse width W and invert backfill longitudinal length L;
[0025] ② Determine the width L of n standard blocks placed horizontally according to the horizontal width W 2 And the width L of the two end blocks placed on both sides of the n standard blocks 2 ’, where W=n*L 2 +2*L 2 ’, n is an integer greater than or equal to 0;
[0026] ③Mark the n standard blocks placed horizontally as B from left to right 1 ~B n , The left end block is marked as D 1 , The right end block is marked as D 2 To B 1 ~B n Denote standard blocks respectively, with D 1 , D 2 Denote the end blocks respectively.
[0027] ④According to B x Invert backfill height at location h x OK B x Height L 3 x ; According to D 1 Invert backfill height at location h 1 OK D 1 Height L D , According to D 2 Invert bac...