A technology of construction device and construction method, which is applied to the processing of floors, building materials, and building components, etc. It can solve problems such as joints that are prone to water leakage, limited hoisting weight, and prefabricated floor slabs, so as to improve construction safety and construction efficiency. , Improving construction safety and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] refer to figure 1 As shown, a pre-tensioning construction device 1 for floor slabs provided in this embodiment includes a support beam 2, and the two ends of the support beam 2 are respectively provided with a front steel bar hanger 3 and a rear steel bar hanger 4, and a prestressed steel bar 5 It is fixedly installed between the front steel bar hanging teeth 3 and the rear steel bar hanging teeth 4.
[0049] During building construction, the pretensioning construction device 1 is hoisted on the floor formwork, or on the load-bearing wall or / and load-bearing beam, so that there is no need to bind steel bars on the floor formwork as in the current construction method, and it can be directly Pouring concrete. After the concrete is cured, pull out the front steel bar hanger 3 and the rear steel bar hanger 4, at this moment the prestressed steel bar 5 will be pulled back to produce prestress. The floor slab constructed in this way is a prefabricated floor slab. Compared w...
Embodiment 2
[0051] refer to figure 2 As shown, a pre-tensioning construction device 1 for floor slabs provided in this embodiment includes a support beam 2, a front support 6 and a rear support 7 are respectively provided at both ends of the support beam 2, and the front support 6 The lower end is fixed with front steel bar hanger 3, and the lower end of rear support 7 is fixed with rear steel bar hanger 4, and prestressed steel bar 5 is fixedly installed between front steel bar hanger 3 and rear steel bar hanger 4.
Embodiment 3
[0053] refer to image 3 As shown, a pre-tensioning construction device 1 equipped with floor formwork provided in this embodiment includes a support beam 2, and front steel bar hangers 3 and rear steel bar hangers 4 are respectively installed at both ends of the support beam 2. A floor template 8 is laid on the crossbeam 2, and a prestressed steel bar 5 is installed between the front steel bar hanger 3 and the rear steel bar hanger 4. Front fixed hooks 9 and rear fixed hooks 10 are installed at the two ends of the supporting beam 2 for connecting with the load-bearing wall or / and the load-bearing beam.
[0054] The above work can be carried out on the ground, and then hoisted to the load-bearing wall or / and load-bearing beam to pour concrete after installation. After the concrete is solidified, pull out the front steel bar hanging tooth 3 and the rear steel bar hanging tooth 4, and the prestressed steel bar 5 will be fixed in the concrete. Since the prestressed steel bar 5 ...