Pre-tensioning quick construction device and method for large-span floor slab
The technology of a construction device and construction method, which is applied in the field of pretensioning rapid construction devices for large-span slabs, can solve the problems of inability to realize prefabricated slab cast-in-place construction, joints prone to water leakage, and no technical reports, etc., so as to save the amount of steel bars, Effects of improving construction safety and simplifying construction operations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] refer to figure 1 As shown, the upper pretension frame 1 provided by this embodiment includes an upper support beam 2, and lower steel bar hanging teeth 3 and 4 are arranged under the two ends of the upper supporting beam 2, and the prestressed steel bar 5 is installed and fixed on the lower steel bar hanging teeth 3 and 4 to get the upper prestressing frame 1; fix the prestressed steel bar 5 in the concrete, and after the concrete solidifies, remove the lower steel bar hanging teeth 3 and 4 at both ends, because the prestressed steel bar 5 itself has tensile force and is fixed by the concrete at the same time Therefore, it will generate a pull back force on the concrete to achieve the prestressing effect, thereby improving the span and flatness of the floor slab and saving steel bars.
Embodiment 2
[0032] refer to figure 2 As shown, the upper pretension frame 1 provided in this embodiment includes an upper support beam 2, and brackets 6 / 7 are arranged at both ends of the upper support beam 2, and the lower steel bar hanging teeth 3 / 4 are respectively arranged at the lower ends of the corresponding brackets 6 / 7 . Install and fix the prestressed steel bar 5 on the lower steel bar hanging teeth 3 and 4 to obtain the upper prestressing frame 1; fix the prestressed steel bar 5 in the concrete, and after the concrete solidifies, remove the lower steel bar hanging teeth 3 and 4 at both ends, and then Pullback forces are created in the concrete. This structure is convenient for installation and disassembly.
Embodiment 3
[0034] refer to image 3 As shown, the lower pretension frame 8 provided by the present embodiment includes a lower support beam 9, and upper steel bar hanging teeth 10 / 11 and fixed hooks 13 / 14 are respectively provided at both ends of the lower support beam 9; the fixed hooks 13 and 14 are connected with the lower support Beams 9 are all connected by detachable fixed connections. Install and fix the two ends of the prestressed reinforcing bar 12 on the hanging teeth 10 and 11 of the upper reinforcing bar to obtain the lower prestressing frame 8 . The prestressed reinforcement 12 is fixed in the concrete, and after the concrete is solidified, the upper reinforcement hangers 10 and 11 at both ends are removed, and a pullback force will be generated in the concrete.