Estimation method of sub-array parallel mismatch in photovoltaic power station
A photovoltaic power station and sub-array technology, applied in the field of estimation, can solve problems such as inaccurate estimation and large differences in test conditions, and achieve accurate results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention is further illustrated below by means of examples, but the present invention is not limited to the scope of the examples. For the experimental methods that do not specify specific conditions in the following examples, select according to conventional methods and conditions, or according to the product instructions.
[0027] refer to figure 1 The method for estimating the parallel mismatch of the sub-arrays of the photovoltaic power plant in this embodiment includes evaluating the parallel mismatch of the sub-arrays of the string inverter and the parallel mismatch of the sub-arrays of the centralized inverter. The estimation method includes the following steps :
[0028] S1: Perform IV scan on the sub-array to obtain the IV curves of n strings in the sub-array, and measure the irradiance and component temperature of the sub-array during IV scanning;
[0029] S2: Calculate the maximum output power of each string according to the IV curve of each st...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com