Basement and upper part structure synchronous construction structure
A simultaneous construction and basement technology, which is applied to building components, building structures, wine cellars, etc., can solve the problems of slow construction speed and poor earthquake resistance, and achieve the effect of fast progress and good earthquake resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0026] In this embodiment, the height of the basement roof 1 is 400mm, and the edge of the basement roof 1 is provided with a concrete turning 2. The height of the concrete turning 2 is 300mm, and the width of the concrete turning 2 is 200mm. The concrete turning 2 is used as the limiting structure of the precast concrete slab 4. , the basement roof 1 is laid with a sliding plate 3, the sliding plate 3 is made of steel plate or hard plastic plate, the thickness of the steel plate or hard plastic plate is 18-22mm, and the precast concrete plate 4 is laid on the sliding plate 3, and the thickness of the precast concrete plate 4 is 300mm, a polystyrene board 9 is set between the prefabricated concrete slab 4 and the concrete inversion 2; a groove is arranged on the upper surface of the prefabricated concrete slab 4, the depth of the groove is 80mm, the width and length of the groove are both 220mm, and the groove is filled with thick Sand 5; Set up dense stirrups 7 respectively at...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


