A method for smelting ferritic stainless steel with charge ferrochromium
A stainless steel and ferrite technology, applied in the field of steelmaking, can solve the problems of restricting the batching structure of the charge, increase the smelting time, increase the cost, etc., and achieve the effects of reducing the production cost, improving the charging conditions and improving the production efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0008] Steel Type 430
[0009] ① The intermediate frequency furnace melts chrome waste and charge ferrochrome (6% by weight of Si) into a premelt, and the intermediate frequency furnace is equipped with 25t of charge ferrochrome. The content of C in this charge is 7.81% by weight and the content of Cr is It is 50.5%, Si weight percentage content is 6.1%, add chromium waste 15t, the C weight percentage content in the chromium waste is 0.039%, Cr weight percentage content is 12.3%, Si weight percentage content is 0.25%. After smelting into premelt, tap the steel into the premelt ladle (premelt ladle number UE12), the tapping amount is 40t, after hoisting to the electric furnace, the weight percentage content of each element in the tapping is: C=4.89%; Si =3.90%; Cr=36.17%; the rest is iron and unavoidable impurities.
[0010] ②The electric furnace melts chromium waste (or carbon steel scrap) into a pre-solution, which is mixed with the intermediate frequency furnace pre-melt. T...
Embodiment 2
[0015] Steel 1Cr13
[0016] ① The intermediate frequency furnace melts chrome waste and charge ferrochrome (6% by weight of Si) into a pre-melt, and the intermediate frequency furnace is equipped with 23t of charge ferrochrome. 50.1%, Si weight percent content is 6.8%, with chromium waste 12t, C weight percentage content in chromium waste is 0.041%, Cr weight percentage content is 2.1%, Si0 2 The weight percentage content is 27%. After smelting into premelt, tap the steel into the premelt ladle (premelt ladle number UE7), the tapping amount is 35t, after hoisting to the electric furnace, the weight percentage content of each element in the tapping is: C=5.09%; Si =4.56%; Cr=36.91%; the rest is iron and unavoidable impurities.
[0017] ② Melt chromium waste (or carbon steel scrap) into a pre-melt in an electric furnace and mix it with the pre-melt in an intermediate frequency furnace. The basicity of the slag in the electric furnace is 1.3. The electric furnace is equipped w...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More