A smelting method and ferrite technology, which is applied in the field of ferritic stainless steel smelting, can solve the problems of high cost, high dephosphorization cost of molten iron, and long treatment time for dephosphorization of molten iron, so as to reduce production cost and improve furnace feeding conditions Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Steel Type 430
[0016] Pour the blast furnace molten iron (the first molten iron) in the torpedo tank into the pre-melting bag
[0017] Fold 30t of the first molten iron into the premelting ladle, the ladle number is UE12, the mass percentage of the main elements in the molten iron is: C=4.18%, Si=0.50%, S=0.038%, P=0.063%, and the rest is iron and unavoidable elements at a temperature of 1261°C.
[0018] The intermediate frequency furnace melts high chromium (chromium waste) into a pre-solution, which is folded into the UE12 bag with the first molten iron. The intermediate frequency furnace is equipped with high-carbon ferrochrome 48t for melting. The mass percentage of each main element in high-carbon ferrochrome is: C=7.32%, Cr=50.49%, Si=4.07%, P=0.020%, and the rest are iron and unavoidable elements. After the melt is melted and cleared, the temperature is measured at 1636°C, and the steel is tapped and folded into the UE12 bag.
[0019] After the converter deph...
Embodiment 2
[0023] Steel type 0Cr13R
[0024] Pour the blast furnace molten iron in the torpedo tank into the pre-melting bag
[0025] Fold 28t of the first molten iron into the premelting ladle, the ladle number is UE8, the mass percentages of the main elements in the first molten iron are: C=4.03%, Si=0.38%, S=0.042%, P=0.061%, and the rest For iron and unavoidable elements, the temperature of molten iron is 1257°C.
[0026] The intermediate frequency furnace melts high chromium (chromium waste) into a pre-solution, which is folded into the pre-melting ladle with molten iron
[0027] The intermediate frequency furnace is equipped with 30t of high-carbon ferrochrome and 15t of chrome waste for melting. The mass percentages of the main elements in high-carbon ferrochrome are: C=7.47%, Cr=50.42%, Si=3.98%, P=0.022%, and the rest For iron and unavoidable elements. The mass percentages of the main elements in chromium waste are: C=0.030%, Cr=12.83%, Si=0.31%, P=0.023%, and the rest are ir...