A landscape water system of an exhibition hall and its construction method
An exhibition hall and landscape technology, applied to the landscape water system of the exhibition hall and its construction field, can solve the problems of improper design, non-operation and high operation cost of water storage facilities, and achieve the effect of simple and feasible construction method, strong practicability and easy to master.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0046] This embodiment provides an exhibition hall landscape water system, which is constructed by the following construction methods:
[0047] Find a slope on the soil base and open a ditch to form a river channel. On the soil base, according to the designed width of the channel, dig 20cm down to form a channel, and set the slope of the ditch side wall of the channel to 0.8:1. The soil is divided into the first component and the second component, and the first component is used to raise the embankment by 3cm, and the second component is evenly spread;
[0048] The anti-seepage shed membranes are laid sequentially from the downstream of the river to the upper reaches of the river, and are laid to 10cm above the river bank, and the anti-seepage shed membrane on the river bank is pressed by turf, and the anti-seepage shed membrane upstream is pressed by overlapping. For the downstream anti-seepage shed membrane, the lap length should be at least 20cm, and the lap joints should b...
Embodiment 2
[0055] This embodiment provides an exhibition hall landscape water system, which is constructed by the following construction methods:
[0056] Find a slope on the soil base and open a ditch to form a river channel. On the soil base, according to the designed width of the channel, dig 15cm down to form a channel, and set the slope of the side wall of the channel to 1.0:1. The soil is divided into the first component and the second component, and the first component is used to raise the embankment by 4cm, and the second component is evenly spread;
[0057] After ditching, carry out the slope check operation, and level the ditch bottom and ditch side walls, and take the step on the ground and the leveling as the standard;
[0058] The anti-seepage shed membranes are laid sequentially from the downstream of the river to the upper reaches of the river, and laid to 20cm above the river bank, and the anti-seepage shed membrane on the river bank is pressed by turf, and the anti-seepa...
Embodiment 3
[0065] This embodiment provides an exhibition hall landscape water system, which is constructed by the following construction methods:
[0066] Look for a slope on the soil base, and open a ditch to form a river channel. On the soil base, according to the designed width of the channel, dig 20cm down to form a channel, and set the slope of the ditch side wall of the channel to 1.0:1. The soil is divided into the first component and the second component, and the first component is used to raise the embankment by 5cm, and the second component is evenly spread;
[0067] After ditching, carry out the slope check operation, and level the ditch bottom and ditch side walls, and take the step on the ground and the leveling as the standard;
[0068] The anti-seepage shed membranes are laid sequentially from the downstream of the river to the upper reaches of the river, and are laid 30cm above the river bank, and the anti-seepage shed membrane on the river bank is pressed by turf, and th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com