Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method for monitoring the progress of power grid engineering projects

A technology for engineering projects and power grids, which is applied in the field of big data processing and can solve problems such as difficulty in monitoring the progress of power grid engineering projects.

Inactive Publication Date: 2022-02-15
EAST INNER MONGOLIA ELECTRIC POWER COMPANY +1
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the defect that it is difficult to monitor the progress of power grid projects in the prior art, and provide a method for monitoring the progress of power grid projects to solve the above problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for monitoring the progress of power grid engineering projects
  • A method for monitoring the progress of power grid engineering projects
  • A method for monitoring the progress of power grid engineering projects

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0103] In order to have a further understanding and understanding of the structural features of the present invention and the achieved effects, the preferred embodiments and accompanying drawings are used for a detailed description, as follows:

[0104] Such as figure 1 As shown, a method for monitoring progress of a power grid project according to the present invention includes the following steps:

[0105] The first step is the acquisition of source data. Import the approved power grid project plan from the PMS system, and import the cost list of the corresponding project from the budget system according to the project number and project name in the power grid project plan.

[0106] The second step is to create a grid engineering project schedule change table and schedule deviation table. The specific steps are as follows:

[0107] (1) Create a schedule change table for power grid projects.

[0108] The power grid project schedule change table is used to record the progres...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for monitoring the progress of a power grid project, which solves the defect that it is difficult to monitor the progress of a power grid project compared with the prior art. The invention comprises the following steps: acquisition of source data; creation of a progress change table and a progress deviation table of a power grid project; establishment of a project plan progress model; establishment of a project actual progress model; and monitoring of the progress of the power grid project. The invention utilizes the hierarchical automaton technology to realize the real-time data change in the implementation process of the technical renovation and overhaul of the power grid, and realizes that the project managers can monitor the progress of the technical renovation and overhaul project of the power grid according to the deviation rate of the progress and cost of each sub-project.

Description

technical field [0001] The invention relates to the technical field of big data processing, in particular to a method for monitoring the progress of power grid engineering projects. Background technique [0002] In the implementation process of power grid technical renovation and overhaul project, the project management of power grid technical renovation and overhaul project plays a vital role in whether the project can be successfully completed. Progress monitoring is especially important to ensure that the project is implemented smoothly according to the plan, so that the power grid technical renovation and overhaul project can be completed as planned without exceeding the plan, and the cost can be saved while ensuring the construction period. [0003] At the same time, the power grid technical renovation and overhaul project is a complex system project, involving work in various aspects such as schedule, cost, risk, quality, and personnel. There are many difficulties and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06312G06Q10/06313G06Q10/06316
Inventor 来文青李岩罗汉武韩建军李文鹏武学亮孙鑫史文江孙丙宇
Owner EAST INNER MONGOLIA ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products