A kind of insulating PVC glove and preparation method thereof
A technology of PVC resin powder and gloves is applied in the field of gloves, which can solve the problems such as the decline of insulation performance, and achieve the effects of low cost, simple production process and strong market competitiveness.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] The raw materials are according to the following weight ratio:
[0037] Bulk polymerization PVC 100 parts;
[0038] 40 parts of trioctyl trimellitate;
[0039] 20 parts of tricresyl phosphate;
[0040] 10 parts of methyl pentachlorostearate;
[0041] 1.2 parts of stabilizer;
[0042] 30 parts of viscosity reducer;
[0043] Insulation improver (calcined clay: insulating mica = 1:1) 15 parts.
[0044] Add it into the mixing tank, stir for 5 hours, prepare PVC paste, and put it into the paste tank of the assembly line after vacuum defoaming.
[0045] Preheat the hand mold to 60°C, dip into the paste, drip for 1.5 minutes and then plasticize in an oven at 190±5°C. The plasticizing time is 5.5±0.5 minutes. After the hand mold is cooled to 70°C, impregnate the polyurethane slurry, and then dry the water in an oven at 130±10°C for 2 minutes. After cooling, crimping, demoulding, and finished product.
Embodiment 2
[0047] The raw materials are according to the following weight ratio:
[0048] Emulsion polymerization PVC 100 parts;
[0049] 40 parts of trioctyl trimellitate;
[0050] 20 parts of tricresyl phosphate;
[0051] 10 parts of methyl pentachlorostearate;
[0052] 1.2 parts of stabilizer;
[0053] 30 parts of viscosity reducer;
[0054] Insulation improver (calcined clay: insulating mica = 1:1) 15 parts.
[0055] Add it into the mixing tank, stir for 5 hours, prepare PVC paste, and put it into the paste tank of the assembly line after vacuum defoaming.
[0056] Preheat the hand mold to 60°C, dip into the paste, drip for 1.5 minutes and then plasticize in an oven at 190±5°C. The plasticizing time is 5.5±0.5 minutes. After the hand mold is cooled to 70°C, impregnate the polyurethane slurry, and then dry the water in an oven at 130±10°C for 2 minutes. After cooling, crimping, demoulding, and finished product.
Embodiment 3
[0058] The raw materials are according to the following weight ratio:
[0059] Bulk polymerization PVC 100 parts;
[0060] 40 parts of trioctyl trimellitate;
[0061] 20 parts of tricresyl phosphate;
[0062] 10 parts of methyl pentachlorostearate;
[0063] 1.2 parts of stabilizer;
[0064] 30 parts of viscosity reducer;
[0065] Insulation improver (calcined clay) 15 parts.
[0066] Add it into the mixing tank, stir for 5 hours, prepare PVC paste, and put it into the paste tank of the assembly line after vacuum defoaming.
[0067] Preheat the hand mold to 60°C, dip into the paste, drip for 1.5 minutes and then plasticize in an oven at 190±5°C. The plasticizing time is 5.5±0.5 minutes. After the hand mold is cooled to 70°C, impregnate the polyurethane slurry, and then dry the water in an oven at 130±10°C for 2 minutes. After cooling, crimping, demoulding, and finished product.