Fabricated conversion layer steel bar positioning construction method
A construction method and transfer layer technology, applied to the processing of building materials, construction, building reinforcements, etc., can solve the problems of inapplicability of prefabricated structures and difficulty in ensuring construction quality, so as to ensure smooth progress, fast and simple construction, and improve The effect of construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] refer to figure 1 The embodiment of an assembled transfer layer steel bar positioning tool of the present invention will be further described.
[0025] The invention provides a construction method for positioning steel bars in an assembled transfer layer, which includes the following steps:
[0026] In step one, the steel bar is processed into a fixed-length steel bar of required length.
[0027] Step 2, place the prefabricated conversion layer reinforcement positioning tool on the upper rubber band according to the positioning line; the prefabricated conversion layer reinforcement positioning tool includes a support frame 1 and a plurality of vertical bars for inserting and fixing steel bars installed on the support frame 1. The tube 3 and the support frame 1 include two vertically arranged mounting plates 11 and two vertically arranged connecting plates 12, the two mounting plates 11 are parallel, and the two connecting plates 12 are respectively connected to the end...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
