Settlement calculation method of multilayer foundation under any load effect
A calculation method, foundation technology, applied in the field of geotechnical engineering
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0087] In the embodiment of the present invention, a certain three-layer foundation is taken as an example to carry out calculation example analysis.
[0088] Rectangular, triangular, sinusoidal, trapezoidal wave loads and instantaneous loads are respectively applied to the three-story foundation, considering the load period T = 30 days, and the load amplitude P 0 =1.5*10 5 Pa. The thickness of the three-layer foundation is 1m, 1.5m, 1m respectively, and the elastic modulus is 1*10 7 Pa, 2*10 7 Pa, 1*10 7 Pa, the permeability coefficient is 3*10 respectively -10 m / s, 2*10 -10 m / s, 3*10 -10 m / s.
[0089] The settlement curves of the three-story foundation with time under various different cyclic loads are obtained through calculation, as shown in Figure 4 As shown, it can be seen that with the increase of time, the settlement under the action of instantaneous load increases with time and tends to be stable, while the growth mode of settlement deformation of layered fou...
Embodiment 2
[0091] In the embodiment of the present invention, a certain import and export yard is used as a calculation case for calculation. The storage yard is built on the soft soil foundation, which can be regarded as a double-layer foundation after foundation treatment. The first layer is the treatment layer with a thickness of 16.5m and a stiffness of 6.85*10 6 Pa, the permeability coefficient is 3*10 -9 m / s. The second layer is a soft soil layer without foundation treatment, with a thickness of 19m and a stiffness of 2.95*10 6 Pa, the permeability coefficient is 1.1*10 -7 m / s.
[0092] Before the stockyard is put into official use, there is a preloading period, and the curve of the preloading period and time is as follows Figure 5 shown. Loading size P during preloading period 0 =75kPa, T=100 days, t 1 = 70 days. This load is different from the cyclically changing regular load. It is an arbitrary load. First, the Fourier series is expanded into a sine and cosine function,...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Permeability coefficient | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com