Unlock instant, AI-driven research and patent intelligence for your innovation.

Assembled rectangular concrete filled steel tubular column-steel girder diaphragm through joint

A technology of rectangular steel pipes and concrete columns, which is applied in the direction of construction and building construction, can solve the problems of large amount of joint welding and high processing accuracy requirements, and achieve the effect of ensuring processing accuracy, ensuring installation accuracy, and fast construction speed

Inactive Publication Date: 2018-06-22
LIAONING TECHNICAL UNIVERSITY
View PDF10 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the technical problems of large amount of on-site welding of nodes and high requirements on machining accuracy in the prior art, the present invention provides an assembled rectangular steel tube concrete column-steel beam partition through node, which includes a rectangular steel tube concrete column, a plurality of Leg steel beams, multiple connection plates, two through bulkheads, and multiple end plates

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assembled rectangular concrete filled steel tubular column-steel girder diaphragm through joint
  • Assembled rectangular concrete filled steel tubular column-steel girder diaphragm through joint
  • Assembled rectangular concrete filled steel tubular column-steel girder diaphragm through joint

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0048] Such as Figure 3 to Figure 5 As shown, the extension arms 6 of the first partition 16 and the second partition 17 in the same direction are connected with the upper flange 13 and the lower flange 14 of the corresponding corbel steel beam 2 by bolts 18, and the rectangular steel pipe concrete column 1 The column wall and one end of the corresponding connecting plate 3 are welded and connected, and the other end of the connecting plate 3 is connected with the web 15 at one end of the corresponding corbel steel beam 2 by bolts 18.

[0049] The specific implementation process of the assembled rectangular concrete-filled steel tube column-steel beam partition joint in Example 1 includes:

[0050] Step 1. According to the node size determined according to the design requirements, process the penetrating partition 4, extend the outrigger flange of the column wall of the rectangular steel tube concrete column 1 that is sufficiently long to ensure that the bolt connection can b...

Embodiment 2

[0061] Such as Figure 6 to Figure 8 As shown, the extension arm 6 of the first partition 16 and the second partition 17 in the same direction are welded to the upper flange 13 and the lower flange 14 of the corresponding corbel steel beam 2, and the column of the rectangular steel pipe concrete column 1 The wall is welded to one end of the corresponding connecting plate 3 , and the other end of the connecting plate 3 is connected to the web 15 at one end of the corresponding corbel steel beam 2 through bolts 18 .

[0062] The specific implementation process of the assembled rectangular steel pipe concrete column-steel beam partition through joint in Example 2 includes:

[0063] Step 1. According to the node size determined according to the design requirements, process the penetrating partition 4, extend the outrigger flange of the column wall of the rectangular steel tube concrete column 1 that is sufficiently long to ensure that the bolt connection can be realized, and pass ...

Embodiment 3

[0074] Such as Figure 9 to Figure 11 As shown, the extension arm 6 of the first partition 16 and the second partition 17 in the same direction are welded to the upper flange 13 and the lower flange 14 of the corresponding corbel steel beam 2, and the column of the rectangular steel pipe concrete column 1 The wall is welded to one end of the corresponding connecting plate 3 , and the other end of the connecting plate 3 is welded to the web 15 at one end of the corresponding corbel steel beam 2 .

[0075] The specific implementation process of the assembled rectangular steel pipe concrete column-steel beam partition through joint in Example 3 includes:

[0076] Step 1. According to the node size determined according to the design requirements, process the penetrating partition 4, extend the outrigger flange of the column wall of the rectangular steel tube concrete column 1 that is sufficiently long to ensure that the bolt connection can be realized, and pass through the partiti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an assembled rectangular concrete filled steel tubular column-steel girder diaphragm through joint and belongs to the technical field of building structure engineering. The joint comprises a rectangular concrete filled steel tubular column, a plurality of brackets, a plurality of connecting plates, two through diaphragms and a plurality of end plates. Each of the brackets comprises an upper flange, a lower flange and a web. The two through diaphragms include a first diaphragm and a second diaphragm, the first diaphragm and the second diaphragm are respectively connectedwith two ends of the rectangular concrete filled steel tubular column, each through diaphragm is provided with a plurality of extension arms extending to different directions, and the extension arms,along the same direction, of the first diaphragm and the second diaphragm, are connected with the upper flanges and the lower flanges of the corresponding brackets. The wall of the rectangular concrete filled steel tubular column is connected with one end of the corresponding connecting plate, the other end of the connecting plate is connected with the web at one end of the corresponding bracket,and the other end of the bracket is connected with the corresponding end plate. The joint is prefabricated in a factory and is transported to the field so that on-site welding workload is reduced andprocessing precision is guaranteed.

Description

technical field [0001] The invention relates to the technical field of building structure engineering, in particular to an assembled rectangular steel pipe concrete column-steel beam partition through joint. Background technique [0002] The rectangular concrete-filled steel tube column is conveniently connected to the steel beam, the force of the connection node is clear, the bearing capacity is high, and the reliability is high. The frame system formed by connecting with steel beams has the advantages of flexible layout, simple structure, and easy realization of standardization of components. Therefore, the joints between rectangular square concrete-filled steel tube columns and steel beams have shown good application prospects in high-rise and super high-rise buildings. [0003] my country's "Technical Regulations for Rectangular Concrete-filled Steel Tube Structures" (CECS159:2004) recommends four types of rectangular concrete-filled steel tube column-steel beam connect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/18E04B1/58
CPCE04B1/185
Inventor 赵中伟梁冰刘海卿孙庆巍
Owner LIAONING TECHNICAL UNIVERSITY
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More