Asymmetric fabricated steel cable-stayed bridge and erecting method

A prefabricated and asymmetric technology, applied in the field of bridge structure, can solve the problems of increasing the length of the main beam, increasing the erection site, and reducing the difficulty of erection, so as to shorten the length, reduce the requirements of the site, and reduce the difficulty of erection.

Inactive Publication Date: 2018-07-27
ZHEJIANG JIAOKE TRAFFIC TECH CO LTD +1
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The present invention solves the problem of the existing assembled highway steel bridge, the main girder and the main tower are vertical structures, and the length of the land span is equal to the length of the suspended river span, resulting in an increase in the length and weight of the main girder, which requires a larger erection site and increases To overcome the defect of difficulty in erection, an asymmetric assembled steel cable-stayed bridge and its erection method are provided, the angle between the main tower and the main girder is changed, and the weight of the main tower is used to shorten the length of the land span and the overall length of the main girder length, thereby reducing the site requirements for erection, and also reducing the difficulty of erection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Asymmetric fabricated steel cable-stayed bridge and erecting method
  • Asymmetric fabricated steel cable-stayed bridge and erecting method
  • Asymmetric fabricated steel cable-stayed bridge and erecting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0035] Embodiment: a kind of asymmetric fabricated steel cable-stayed bridge (see figure 1 ), including the main girder and the main tower 5 connected to the main girder. The main girder is divided into a suspended river span 3 and a land span 10. In the system, the main tower is connected to the tower beam consolidation truss and is inclined to one side of the land span, and the length of the land span is less than the length of the suspended river span. A hanging river stay cable 4 is connected between the top of the main tower and the suspended river span, and a land stay cable 9 is connected between the top of the main tower and the land span. Main tower erection auxiliary support 8 is connected between the main tower and the suspended river span, the main tower erected auxiliary support and the suspended river span are hinged and fixed, and the main tower erected auxiliary support top and the main tower are movable hinged.

[0036] The bottom of the main tower is equippe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an asymmetric fabricated steel cable-stayed bridge and an erecting method and overcomes the defect that erecting difficulty is increased caused by the fact that a large erecting site is needed due to length increase and weight increase of a main beam as length of a land span is equal to that of a river span in the prior art. The asymmetric fabricated steel cable-stayed bridge comprises a main beam and a main tower connected on the main beam, the main beam is divided into a river span and a land span which are connected horizontally through a tower beam consolidation truss to form a consolidation system, the main tower is connected on the tower beam consolidation truss and inclines to one side of the land span, length of the land span is smaller than that of the river span, river stay cables are connected between the top of the main tower and the end of the river span, and land stay cables are connected between the top of the main tower and the end of the land span. The main tower inclines relative to the main beam, so that the length of the land span is shortened, length of the whole main beam is shortened, requirements on sites during erecting are lowered,and erecting difficulty is lowered.

Description

technical field [0001] The invention relates to a bridge structure, in particular to an asymmetric assembled steel cable-stayed bridge and its erection method. Background technique [0002] The prefabricated highway steel bridge is a standard bridge that can be disassembled and can be erected quickly. be widely used. Especially at the critical juncture of emergency rescue and when time becomes the key factor, the prefabricated highway steel bridge plays a very important role. [0003] With the rapid development of my country's highway construction, especially the comprehensive construction of national expressways, long-span (single-span ≥ 70m) highway bridges are becoming more and more popular. These bridges will be damaged due to natural disasters such as earthquakes, flash floods, mudslides, or people's daily traffic activities, resulting in traffic interruption. In order to ensure the normal progress of social order, we need to take measures to ensure the smooth flow o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D11/04E01D19/14E01D21/00E01D101/30
CPCE01D11/04E01D19/14E01D21/00E01D2101/30
Inventor 邵吉林张明文
Owner ZHEJIANG JIAOKE TRAFFIC TECH CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More