Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

New energy vehicle operation and management method based on internet information system

A new energy vehicle, Internet information technology, applied in the field of new energy vehicle operation and management based on Internet information system, can solve the problems of unclear remaining cruising range, unable to find the driver, vehicle theft, etc., so as to reduce the risk of vehicle theft , The operation is simple and convenient, and the effect of improving operational efficiency

Inactive Publication Date: 2018-07-27
河南智行新能源科技有限公司
View PDF8 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the price of pure electric vehicles on the market is relatively high, even expensive. Even if you buy a pure electric vehicle, it is difficult to find a matching charging pile for charging. Therefore, the field of pure electric vehicle rental that is small, flexible and comfortable to drive has emerged
[0003] However, the existing vehicle control system in the field of electric vehicle rental has the defect of single function. Sometimes the vehicle is stolen, the condition of the rental vehicle including the remaining mileage is unclear, the driver does not follow the prescribed route, and the driver cannot find a charging station. Stations or power stations to supplement electric energy for rental cars, and enterprises cannot dispatch vehicles quickly and efficiently. Therefore, many enterprises have the need for real-time monitoring and management of vehicles.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • New energy vehicle operation and management method based on internet information system
  • New energy vehicle operation and management method based on internet information system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0026] Such as Figure 1 to Figure 2 As shown, a new energy vehicle operation management method based on an Internet information system includes the following steps:

[0027] Step S1, the user reserves a new energy vehicle: the user initiates a vehicle application through the user reservation module 102 of the user terminal 1, and the third communication module 107 sends the user's vehicle application to the operation management center 6 through the Internet. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a new energy vehicle operation and management method based on an internet information system. The method comprises the specific steps that users reserve new energy vehicles; anoperation and management center saves user application information and sends verification codes; vehicle-mounted monitoring terminals collect vehicle information and feed the vehicle information backto the operation and management center; the operation and management center re-plans paths and conducts vehicle fault handling; the users return the vehicles and pay money, and therefore the whole renting process is completed. The method aims at overcoming the endurance mileage defect of the new energy vehicles, the monitoring system integrates the new energy vehicles, charging stations and parking stations through the internet, the unified vehicle allocation and management of vehicle operation companies are facilitated, the method helps the users to easily obtain charging station information, the problem that the vehicles cannot be driven due to the power shortage of batteries of the vehicles is solved, the operation of renting and returning the vehicles by the users is simple and convenient, the vehicle stealing risk is reduced, and the operation income is increased.

Description

technical field [0001] The invention belongs to the technical field of vehicle operation management, and in particular relates to a new energy vehicle operation management method based on an Internet information system. Background technique [0002] With the development of science and technology, people's pursuit of automation and intelligence is getting higher and higher, and cars are an indispensable means of transportation in our lives, and people's requirements for vehicles are getting higher and higher. Especially in terms of fuel saving, it is not only a key demand that people consider when driving, but also an important green means to protect the earth's environment. As a result, the advent of electric vehicles has been recognized and welcomed by people, especially pure electric vehicles, which do not need to burn fuel and do not pollute the atmosphere. However, the price of pure electric vehicles on the market is relatively high, even expensive. Even if you buy a pu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/06G06Q10/02G06Q30/02G07F17/00G07C9/00
CPCG06Q10/025G06Q30/0208G06Q30/0226G06Q30/0645G07C9/00182G07F17/0057
Inventor 田海玉康国庆江敏陶贺
Owner 河南智行新能源科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products