Connecting mechanism of composition board and floor
A technology of connecting mechanism and combined board, which is applied in the direction of building structure, floor, building, etc., can solve the problems of large combined board area and the inability to use tools to fill the joints of the combined board, and achieve the effect of avoiding deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] see Figure 1 to Figure 3 , a connection mechanism between a composite board and a floor, including a movable rod 1, a fixed frame 2 and a main material pipe 3, the fixed frame 2 is used to connect the composite board and the floor, and the main material pipe 3 is fixed on the fixed frame 2 and located at the two ends of the fixed frame 2 are respectively set on the interface 4, the movable rod 1 is provided with a bar-shaped discharge port 5, and the strip-shaped discharge port 5 is connected to the main material pipe through the hose 6 3 communicated, and the main feed pipe 3 is communicated with the foaming machine. The foaming system of the foaming machine fully foams the foaming agent mechanically, mixes the foam and cement slurry evenly, and then transports it to the main material pipe 3 through the pumping system of the foaming machine, and the main material pipe 3 and the hose 6 connection, the mixture of foam and cement slurry is discharged through the dischar...
Embodiment 2
[0025] see Figure 1 to Figure 4 The difference between this embodiment and Embodiment 1 is that first elastic members 8 are provided on the hose 6 , and the first elastic members 8 are equidistantly distributed on the hose 6 . The pumping system of the foaming machine pumps the mixture of foam and cement slurry into the hose 6, the inside of the hose 6 is pressurized and the hardness increases, and the first elastic member 8 is used to bend the hose 6, so that the movable rod 1 rises The process hose 6 can be folded between the fixed frame 2 and the movable rod 1 at a certain interval.
[0026] Specifically, a first magnet 9 is provided above the fixed frame 2 , and a second magnet 10 is provided below the movable rod 1 , and the first magnet 9 and the second magnet 10 attract each other. The first magnet 9 and the second magnet 10 attract each other. During installation, the movable rod 1 of the previous connection mechanism and the fixed frame 2 of the next connection mech...