BIM based synergetic method and system
A collaborative system and statistical system technology, applied in marketing, instruments, electrical digital data processing, etc., can solve the tedious and unfavorable problems for users to quickly obtain construction costs and initial quotations, reduce error rates, improve the speed of comparison reports, The system is easy to use and convenient to use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0033] A collaborative method and system based on BIM, such as figure 1 As shown, the methods include
[0034] S1: Simulate 3D construction through the time axis in BIM simulation system 1; specifically, the time axis includes multiple time points, and each time point is a different stage of simulating 3D construction; each time point corresponds to multiple actual reports ;The time axis is the time required for the completion of the building and is synchronized with the actual time; the actual report includes information such as components, component models, component prices, the name of the person filling in, and the filling date; the time axis is June 11, 2018 Until December 11, 2018, the time points include July 11, 2018, August 11, 2018, October 11, 2018 and December 11, 2018.
[0035] S1-2: The BIM simulation system 1 sends multiple actual reports to ...