Mountain cultivation method of rhododendron simsii
A cultivation method and mountain technology, applied in the field of rhododendron planting, can solve problems such as low survival rate of rhododendron, and achieve the effects of preventing soil and water and nutrient loss, preventing soil erosion, and improving survival rate and growth.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] A mountain cultivation method of Rhododendron, comprising the steps of:
[0037] (1) Set up the planting area
[0038] Select a hilly area, select the slope of a sunny mountain, and there is another mountain with an altitude 10m higher in the south of the mountain, divide a plurality of Rhododendron cultivation areas according to the vertical direction of the contour line, and dig out ladders in each Rhododendron cultivation area. Belt, remove the weeds, debris, floating soil, pumice on the ladder belt, and level the ladder belt;
[0039] (2), ladder belt reinforcement
[0040] The protective piles are driven perpendicular to the ladder belt along the inner edge of the ladder belt, and the protective piles are arranged at intervals or continuously to form a ladder belt reinforcement structure;
[0041] (3) Laying of hidden drainage pipes
[0042] Lay a hidden drainage pipe in the soil near the inner edge of the ladder belt. The hidden drainage pipe is a tubular struc...
Embodiment 2
[0067] A mountain cultivation method of Rhododendron, comprising the steps of:
[0068] (1) Set up the planting area
[0069] Select a hilly area, select the slope of a sunny mountain, and there is another mountain with an altitude 50m higher in the south of the mountain, divide a plurality of Rhododendron cultivation areas according to the vertical direction of the contour line, and dig out ladders in each Rhododendron cultivation area. Belt, remove the weeds, debris, floating soil, pumice on the ladder belt, and level the ladder belt;
[0070] (2), ladder belt reinforcement
[0071] Drive the protective piles perpendicular to the ladder belt along the inner edge of the ladder belt, and the guard piles are arranged at intervals to form a ladder belt reinforcement structure;
[0072] (3) Laying of hidden drainage pipes
[0073] Lay a hidden drainage pipe in the soil near the inner edge of the ladder belt. The hidden drainage pipe is a tubular structure that runs through the...
Embodiment 3
[0097] A mountain cultivation method of Rhododendron, comprising the steps of:
[0098] (1) Set up the planting area
[0099] Choose a hilly area, choose the slope of a sunny mountain, and there is another mountain 30m above sea level in the south of the mountain, divide a plurality of Rhododendron cultivation areas according to the vertical direction of the contour line, and dig out ladders in each Rhododendron cultivation area. Belt, remove the weeds, debris, floating soil, pumice on the ladder belt, and level the ladder belt;
[0100] (2), ladder belt reinforcement
[0101] The protective piles are driven in perpendicular to the ladder belt along the inner edge of the ladder belt, and the protective piles are arranged continuously to form a ladder belt reinforcement structure;
[0102] (3) Laying of hidden drainage pipes
[0103] Lay a hidden drainage pipe in the soil near the inner edge of the ladder belt. The hidden drainage pipe is a tubular structure that runs throug...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com