Charging pile network communication device, method and system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] Narrow Band Internet of Things (NB-IoT) signal coverage is wide, the first communication module 3 and the second communication module 4 can be set as NB-IOT modules, the first communication module 3 and the second communication module The module 4 communicates with the server 1 using the NB-IOT protocol. Compared with 4G long-term evolution (4G LTE), it can increase the gain of 20Db, which is equivalent to improving the coverage area capability by 100 times. And the cost of the NB-IOT module is low, even if the cost of setting two NB-IOT modules on each charging pile is lower than that of 3G, 4G and other modules used in the prior art, saving communication costs.
Embodiment 2
[0071] The Internet of Things module (hereinafter referred to as the LORA module) also has the characteristics of long communication distance, low power consumption, and low cost. Therefore, the first communication module 3 and the second communication module 4 can also be set as LORA modules. The module 3 and the second communication module 4 communicate with the server 1 using the LORA protocol.
[0072] Based on the above composition, the device described in the embodiment of the present invention can work in different working modes according to different states of the charging pile, that is, different communication modes. The first communication module 3 and the second communication module 4 perform different operations respectively, and have different configurations. The combined state of the system forms different working modes, that is, communication modes. Specifically, it can be realized by setting a control module in the device, and the control module is used to cont...
Embodiment 3
[0087] The method comprises the steps of:
[0088]Step S101, if it is detected that the charging pile needs to be upgraded, that is, the upgrade information of the charging pile is in the state to be upgraded or partially upgraded, then it is judged whether the usage information of the charging pile 2 is in use,
[0089] Step S102, if yes, control the device to work in the first communication mode, otherwise, control the device to work in the second communication mode.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com